Jump to content

Log in or register to remove this advert

dumper

Veteran Member
  • Posts

    2,071
  • Joined

  • Last visited

  • Days Won

    2

Everything posted by dumper

  1. I would look at a mixer bucket
  2. Which loader you could convert a cement mixer there’s some on eBay
  3. Yes hoses bought ce marked rotator bought ce marked with capacity grab bought ce marked with capacity steel bought known strength and quality assured bolts bought graded for load welding tested by loading therefore machine can have swl HSE happy(maybe) paperwork trail to prove
  4. Make your own less than a grand with rotator
  5. I would live with it for a year observe and then decide then chose the plan to follow your neighbors may have some good local knowledge you can benefit from after all it is only 365 days to wait don’t be impatient
  6. So what does it cost you per year for these stickers
  7. dumper

    Stihl 070

    Then you are looking in the wrong place you need one of these
  8. What were they thinking? Or not!
  9. Found this clearing out drawer remember being told we have the Dumper a little stuck
  10. For for me blade runner directors cut thirteenth warrior unstopable
  11. Rather you than me
  12. Yes
  13. We tried to shear 450 square greenheart but couldn’t just ran out off power 1/3 to1/2 way through like the grapple head idea, I think it would work especially if the feed is slowed right down
  14. These piles can be 4m into the river bed a 9 tonne winch isn’t going to be much good, we used a 100 tonne crane and a vib clamp last time and it struggled if the river is navigable the whole pile has to be removed or you pay to have it marked on the maps you can just cut then off
  15. Have you cut greenheart with a tree shear? It makes oak look like balsa
  16. Look at a tb 219 rather than 216/016 more reach usually well looked after
  17. You have tried to speak to someone with a brain rather than the office idiot? try NFU, I have never had problems but they are not cheap
  18. Offset ? Sloping ground , I would rear mount a topper less power required than a flail more stable in working position could add width to the wheelbase
  19. They will need to be vibrated out clamp top vib and pull it’s a time consuming and expensive job, I don’t think a shear will have anywhere near the power or operator control required ,your barge will be moving we tried to shear some that we pulled out of the Thames and failed if not diver and saw will not be slow, suck out round the pile so they can kneel or stand,then cut.they made us wear chainsaw trousers last time till we proved they gave no cut protection from the saw
  20. More like 6 pence, half a crown!
  21. I work for a client they categorically state no huawei phones on site and prefer us to use other brands
  22. I forgot they are a bitch to tow if they get stuck
  23. Nice if the ground is dry awful in the mud without tracks,avant or multione will out lift and outmanoeuvre
  24. Bit of plate, old crow bar, couple of rods and your done less than a fiver !
  25. You got to send it to spud

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.