Jump to content

Log in or register to remove this advert

What would you charge?


AWarb00
 Share

Recommended Posts

3 hours ago, benedmonds said:

But skyhuck's big kit slow and steady method has a huge advantage... Not have employees who cause huge headaches..

Not sure I would call it slow.

 

I don’t think the pictures do the tree justice. It’s possible the biggest Sycamore I’ve felled. Not massively tall, but huge amount of big timber. The bottom 6ft weighed the best part of 3ton and was a good 5ft across. Each day the timber trailer was pretty full. We let the site exactly as we found it, without a divot in the lawn or a swished flower.

 Customer was away, but watched some of the takedown on his cctv. He texted to say he was very happy. I had allowed for 4 days, I’ve had “big timber” trees bite me on the arse before.

 Anyone doing that tree without a crane would have taken much longer and smashed the hell out of some of the garden, IMO.

  • Like 4
Link to comment
Share on other sites

Log in or register to remove this advert

8 hours ago, EdwardC said:

There's an article in the current ARBmagazine on pricing. Page 80.

 

Basic, but a good start.

 

Now I have a spreadsheet which has costs in it for the various elements of the work I do. Put the hours I expect things to take in, and out pop's the price.

 

When I was contracting, pre-2005, I was charging £950.00 +VAT per day for a three man team, £450.00 + VAT per day for a two man team. North West based.

Why over double for an extra man? 

Link to comment
Share on other sites

8 hours ago, EdwardC said:

When I was contracting, pre-2005, I was charging £450.00 + VAT per day for a two man team. North West based.

Me too, prices have risen very little since then and at times I think they actually fell.

Back then making money was easy, but there were far far less tree firms out there. 25 years ago when I first started you never saw a chipper these days often see three or mor a day. 

  • Like 3
Link to comment
Share on other sites

8 minutes ago, skyhuck said:

Me too, prices have risen very little since then and at times I think they actually fell.

Back then making money was easy, but there were far far less tree firms out there. 25 years ago when I first started you never saw a chipper these days often see three or mor a day. 

Yeah, I notice the amount of tree gangs driving around whenever I’m back in the UK.

 

I wonder where they all get the work?

Link to comment
Share on other sites

2 minutes ago, Mick Dempsey said:

Yeah, I notice the amount of tree gangs driving around whenever I’m back in the UK.

 

I wonder where they all get the work?

They are like confetti round here .

Link to comment
Share on other sites

1 hour ago, EdwardC said:

Because the jobs were usually bigger and more techincal and often required more than one vehicle. As for them being an extra groundie, they were all climbers.

 

For those who have a climber and groundie what is in the risk assessment for climbing without a rescue climber. And if they're a climber why aren't you using them as such.

The numbers still don’t stack up. Not saying you didn’t, just saying it don’t seem to stack up. 

 

Complexity =  more time (possibly additional skill sets) but 450 for 2 climbers and 950 for 3 makes no sense. 

 

450 / 2 = 225

 

225 x 3 = 675 not 950

 

275 (on top of 225) for the 3rd man?

 

Makes no sense. 

 

 

 

 

  • Like 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.