Jump to content

Log in or register to remove this advert

Rough Hewn

Veteran Member
  • Posts

    6,246
  • Joined

  • Last visited

  • Days Won

    40

Everything posted by Rough Hewn

  1. Last time we got hit a few months back, they climbed over two 8'+ steel gates, Kicked the shit out of two alsatians, ripped the locks off all containers, Moved the vehicle parked in front of Saw container, Cut through lock guards with cordless angle grinder, Cut all hardened locks. Made off with 25k of tools. Now someone is staying on site every night. I don't own any big machinery, all my kit goes home into my house every night. Total ball ache. The Mrs complains about sawdust/mud through the kitchen. No easy answers.
  2. Well done mate, I know what the Bretons are like[emoji6] Took my brothers 20 years to be accepted, my parents have been there 30 years, still referred to as les anglais. [emoji106]
  3. What size mate? Guy next to me has some. But I'm in Yorkshire.
  4. Andy and eggsy aside..., An observation... The more intelligent you are, the more you should earn. This premise fascinates me. It's a superiority complex. See it all the time. Doctors,business men, lawyers etc If we are all equal humans, why would intelligence matter? Whether you're a bin man or doctor, a days work is a days work. [emoji848]
  5. You run Arbtalk and have an American veneer office set.[emoji848] Chip it.[emoji13][emoji95][emoji95][emoji95] Put up a request for some nice BRITISH, locally sourced,locally milled exquisite hardwood.[emoji12] And a joiner to put them together. (Be a good thread for the wood working section?) I'm sure you'd get a good price. [emoji6][emoji106]
  6. [emoji23][emoji23][emoji23] tea spitting moment [emoji106]
  7. Carlton are the same as Oregon or stihl quality wise. Granberg ripping chain is Carlton. Oregon owns Carlton. [emoji106]
  8. Worrying thing is, the client only wanted a bench... [emoji51][emoji23][emoji23][emoji23]
  9. Little oak job today, Wasn't expecting anything particularly nice. So far nothing special. Then this happened....... [emoji16][emoji16][emoji16][emoji106][emoji106][emoji106]
  10. It's the economy of running a bandsaw. 4 stroke engine running on straight pump fuel, water as lubricant, cuts ridiculously fast, bands are very cheap. If you charged £40 an hour, no one would bat an eyelid, and you and your lad could both have a pay rise? [emoji106]
  11. Very interesting project [emoji106][emoji106][emoji106]
  12. [emoji23][emoji23][emoji23] Maybe 30 mins each end. It's always 3-4 hours driving though. More with bad traffic. [emoji106]
  13. That's less than minimum wage. [emoji51]
  14. @£30 per hour for 8 hours, that's £240. My over heads are £175. I'd be on £65 for 14 hour day at that price. [emoji23][emoji23][emoji12][emoji106]
  15. Chainsaw milling is a bit different to bandsaw milling. Let me break it down. An hour plus per chain on the grinder. Grinds £25 off a £100 chain per job. An hour or two driving to site. 7-8 hours onsite. Every time you hit a chunk of metal it's 45-60 mins filing off another £25. Another hour of two driving back. Bars are £400+ when you've bent it/ worn it 10litres of motomix £40 6 litres of bio oil £35 Panther mill £700 Ms880 £1800 By the time you've loaded/ unloaded your looking at a 14 hour day minimum. I charge £395 a day. Take out: £40 saw fuel £35 oil £50 half a chain £20 vehicle fuel £25 for 1% value if saw and mill. That's £220 I earn for a 14 hour day. I charge £150 with a 261 for 7-8 hours. Any less than £395 is insane. Also the wood I cut is often worth £395+ a slab. Hmmmm Price just went up to £450. [emoji106]
  16. Last big chunk of olive ash, milled in the pouring rain. Worth it. [emoji106][emoji106][emoji106]
  17. Interested. Call me. 07376803384 Saul [emoji106]
  18. Same bar and chain, same log. This is a stihl 660 "Wonky ported" 100cc big bore, double jungle muffler and lots more:[emoji12][emoji106] [emoji106][emoji106][emoji106]
  19. This a stock 661 3/8 36" on a semi seasoned lump on hard stuff: [emoji106]
  20. Some old ported Saw vids. Stihl 461 3/8 25" stock vs husky 560 325 25" spud ported:[emoji12] [emoji106][emoji106][emoji106]
  21. Mine turned green within days of milling. Took it to a mate who has a big unit. Clouds of mold spores. Did I mention it's sticky?.... And spiky?.... [emoji12]
  22. Sounds way too cheap. But possible.
  23. My day rate is £395. 7-8 hour day. If I had a mobile bandsaw I'd be charging £495 a day minimum. Don't undervalue yourself. But "mates rates" if it's a two way street. [emoji106]

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.