Jump to content

Log in or register to remove this advert

woody paul

Veteran Member
  • Posts

    5,662
  • Joined

  • Last visited

Everything posted by woody paul

  1. That's about right, as long as there's 2 standing around and 1 working will look like council do it anyway.
  2. Try big tyres they have all sorts of tyres. Also Fieldons ort Ltd.
  3. Looked there and to big for tractor and massage John .
  4. That's what I was thinking.
  5. There was an old model for sale near me about a year ago but didn't go for it. Second hand pto chippers swam to be thin on the ground at the moment.
  6. Minimal damage and best of all minimal effort.
  7. Planning to upgrade pto chipper, been looking at TP200. Thing is tractor is 60hp is anyone running one on the lower hp required and how does it run. Any other 8inch chipper worth look at for low hp tractor.
  8. So it's turning over and not starting, fuel shut off on injector pump maybe worth checking.
  9. No one trailer, classed as lose coupled.
  10. No trailer brakes ether. One farm near me never ties bales on, then another never leave it to chance and keeps it simple by running a good wide strap right over from front to back
  11. Rolled a lump of cedar across a church yard years ago, was twice as long as the bit you are on about with loader tractor, then bloke that was milling it picked it up with hiab. If you have more then one lift Telehandler would be worth considering if access is good.
  12. I would say it has lacked inspection as it is a major failure in the main structure. When using any piece of machinery like that it should be check before use if you don't it will catch you out at some point and you many never find out why.
  13. Keep forgetting you have upgraded to that monster of a tractor. As said silage trailers are sometimes shorter which may suit you better if any gate ways are tight to get into.
  14. Can you not just add sides to Fleming.
  15. This is what I mean by lowland potato trailer.
  16. Company near me runs all sorts of trailer to suit access to jobs, couple of 10t AS Marston a couple of 12t lowland potato trailers which they can blow chips over the side of with there TP 200 all standard height sides. Have a look at Hartwood trees site they have a heavy duty construction trailer with extra sides made for it.
  17. How did you get on getting it repaired.
  18. Have you asked a grab lorry company to take brash or wood away, they just don't want to know in my area.
  19. Put your self in the customers shoes at the end of the day, were did they go though out the day. Just knock on door and ask to use loo, they then realised you respect there garden.
  20. Get the person how started job to finish it.
  21. As already said big saw short bar and keep it sharp. And don't back off at any point or stop cutting.
  22. Heavy boot, Meindi woodwalk good all round boot plenty of grip watch out on size bit on the small side need to go up a size.
  23. Bit of wire around post going though panel. Just buy the timber and make panels up between posts
  24. Sharpened hacksaw blade heat to red straight though taped end then heat shrink
  25. That definitely marks were the door knob is.

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.