Jump to content

Log in or register to remove this advert

redwood dismantle


testcricket01
 Share

Recommended Posts

Log in or register to remove this advert

  • Replies 148
  • Created
  • Last Reply

Top Posters In This Topic

No real reason apart from on that there was just to much going on in a small area 4 ropes couldnt really get to the stem easily, plus i just have ocd about leaving a nice neat pole no rips and messy cuts :blushing:

 

I'm the same, but for me it a smooth peg free stem I need :blushing::thumbup1:

Link to comment
Share on other sites

What was going on with the chogs being lowered? thought you said they were getting the hang of letting it run? Nice video and 14:20 made me wince a bit for your hand especially as it rolled over that point seconds later. Shame the rain spoilt the crane footage a bit. Still think it was only 80-85ft thought even after more so seeing that camera view from the top as the cedar we measured was roughly the same perspective. :001_tongue:

Link to comment
Share on other sites

Whats with the hands in the kerf James, again? Dont answer, just more awareness needed.

 

The groundies locking up the line etc....get some polydyne, you dont have to worry so much then.

 

If you're gonna block down with a Karabiner (which you probably shouldn't), then the gate should be pointing out, not in. Same with crane hooks. The line or chain should always press on the spine, not the gate.

 

For big conifers, if you can find a landing and devise a ground anchor somehow, a zip-line is way quicker and easier than conventional rigging, with less manpower needed. No haul-back line, just a bunch of slings. You shouldn't limit the use of a zipline as a means to save some dragging time by moving stuff through the air as is how a lot of people think....consider also as a quick means to put stuff on the ground with reduced or controlled impact. For big single stemmed tree with lots of limbs like that, you should always be looking for it when you price the job.

Link to comment
Share on other sites

I agree with others comments re the hand in the gap. Shocked me when I saw it and then again when the log started moving.

 

 

Just a question about lifting the logs. We're you on one chain or two? If two would you not have been better getting a straight lift? If you were lifting with one chain fair enough. I have no crane experience, but if I were to do that I would lift with two if I could.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.