Jump to content

Log in or register to remove this advert

Shipping container Kiln


Big Beech
 Share

Recommended Posts

Jesus Christ !!!  Christmas has come early - 2 - 3 x air dried.
 
Is there a rule of thumb average how many years say Oak has to be kept stickered air drying before force drying.  e.g 1" slabs 9 months, 2" slabs 18 months, 3" 2 years, 4" 4 years? Thanks.
 
I would have electricity supply controlled by thermostat that takes over if the accumulated drops below a pre-determined temperature.

No.
That’s the difference between fresh sawn and kiln dried to 8-10%.

Yes, but it’s often misunderstood.
In perfect conditions...
It’s one inch a year measured from the centre to the outside!
Ie 4” oak two years
2” oak one year
The further away from perfect you are, the slower it is to dry.
[emoji106]
Link to comment
Share on other sites

Log in or register to remove this advert

43 minutes ago, arboriculturist said:

Does drying the air dried planks you have had stickered up dry for the last year or 2, really add that much value to them and make them that much more marketable.

 

If it were to add 25% to a £100 plank, which then sells for £125 then maybe it is worth the investment and additional handling costs. Handling costs money and all labour input need to be accounted for.

 

There is the issue of having a room that is kept below 10% ambient MC that has to be constantly heated, as somewhere to store the dried planks..

 

I have a 20 ft container that is already insulated with 450m celotex that could be used for the purpose and 25 solar panels 250watt that could be used to heat an accumulator during daylight hours and would heat the installation 24/7.

You've got 25 250watt panels?, that's 6,250watts. You could power Blackpool illuminations with that lot🙂

Link to comment
Share on other sites

5 hours ago, eggsarascal said:

You've got 25 250watt panels?, that's 6,250watts. You could power Blackpool illuminations with that lot🙂

If he's meaning solar PV panels, and not thermal, then he'll likely get about 0.75MWh for every 1kW installed peak capacity per annum and 80% of that will be May till August, when a solar thermal kiln will do well enough on its own.

Edited by openspaceman
added time
Link to comment
Share on other sites

8 minutes ago, openspaceman said:

If he's meaning solar PV panels, and not thermal, then he'll likely get about 0.75MWh for every 1kW installed peak capacity per annum and 80% of that will be May till August, when a solar thermal kiln will do well enough on its own.

No good arguing with eggs as he has been reading up on things today.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.