Jump to content

Log in or register to remove this advert

Two Rope Working Consultation


Tom D

Recommended Posts

58 minutes ago, Mark Bolam said:

I don’t see remote anchors as a problem when accessing SRT.

You can route your line easily so you have plenty of backup from lower limbs if the top point were to fail.

Completely agree , I'm guessing the statics on anchor point failure are based on DDRT , mainly due to the nature of SRT not being around long and that very point of multiple back up from lower limbs . 

Do we now have to think tackling  a set of stairs is going to be working at height . We are in danger of complicating things as previously stated and I believe also its a method and industry not completely understood . 

  • Like 1
Link to comment
Share on other sites

Log in or register to remove this advert

Dont think anyone has mentioned how this will affect our quoting proccess.

Time is money!

The more time we spend selecting 2 tips,getting into the tree,working the tree with 2 ropes will take more time etc this will have a knock on effect in what we charge the customer,which in turn very well could result in part time charlies or the uninsured/un proffesional obtaining more work.

Not a safety point of view  but still pertinant to our industry

Edited by stihlmadasever
  • Like 5
Link to comment
Share on other sites

I read through the 2004 report of “2 rope working” on NTPC/Lantra assessments from the HSE WAHR from groups around the country. The conclusions seem like it’s a confusing scenario and a difficult concept to grasp especially with trainees. I don’t understand why this method is being brought back to consideration when it seemed defunct after so many concerns raised.

 

My team will be trailing this method within the next 2 weeks incorporating rescue situations and I would like to report back. I guess I can only give constructive feedback once I’ve experienced this myself with a team.

 

The duties of ground based staff would be of a higher responsibility. Rope management as well as standard operations could be conflicting. Include rigging operations at the same time, then work efficiency would drop dramatically. 

 

Simple operations eliminates confusion. Education is paramount.

  • Like 3
Link to comment
Share on other sites

14 minutes ago, Steve Bullman said:

Well it is really. People will be getting prices wrong, and climbers will be in a hurry rushing to get work done as a result. This is probably one of the biggest causes of accidents at work.

No they won't, when was the last time you pulled your bollocks out?, most of us (any trade) are old enough and wise enough to get the job done without killing ourself.

Link to comment
Share on other sites

3 minutes ago, eggsarascal said:

No they won't, when was the last time you pulled your bollocks out?, most of us (any trade) are old enough and wise enough to get the job done without killing ourself.

I’m not talking about myself, I’m talking about younger more inexperienced climbers who may feel under pressure from the boss 

  • Like 3
Link to comment
Share on other sites

1 hour ago, Steve Bullman said:

I’m not talking about myself, I’m talking about younger more inexperienced climbers who may feel under pressure from the boss 

...and that is EXACTLY THAT ... I have seen more 'incidents' cos 'We gotta get the job done ' .

 

Wot . OK. Remind yrself the wife wants you back in one piece ( you kno which piece ;) ) a wheelchair is fr life not just fr Christmas . The  gf has her eye on that wedding ring . Mum has yr birthday tea planned this sunday . Oh yea, but that ' rigging rope will do fr now ' bit late so I will just clip through these red lights on junction , lorry bit full ( an those front tyres are fucked from last week after MoT) but soaking wet from rain an not going back fr nothr load of chip ......

 

Any sound familiar ??? Can't just be me . K

  • Like 2
Link to comment
Share on other sites

On 10/09/2019 at 21:13, Steve Bullman said:

Well it is really. People will be getting prices wrong, and climbers will be in a hurry rushing to get work done as a result. This is probably one of the biggest causes of accidents at work.

I hadnt thought of it that way steve.

Your bang on 

Thanks

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.