Not sure if you can close off a road fotally for ten minutes at a time.. basically, as you are moving from one light to another, the road would effectively be closed all day..

 

You need to talk to the highways authority

 

john..

  • Like 1

Log in or register to remove this advert

Posted
6 hours ago, coppice cutter said:

Stop/Go boards are ideal if you have the manpower free to operate them as they allow you to regulate the traffic there and then and not keep people sitting when there's no need.

 

Agreed. People on boards can make decisions in the moment about releasing traffic which makes for a far smoother operation from a traffic point of view. Especially if close to fixed traffic lights at one end of your work lane because you can't afford to have traffic stacking up close to them.

 

In my experience the abuse is far less when using boards than if you operate the same system with lights as you're able to let things flow better.

  • Like 1
Posted
3 hours ago, coppice cutter said:

Big difference between closing a road completely, and running a single lane traffic system which is what you are doing with stop/go boards.

OP stated; "so i need to get the whole road length that i am working on sectioned off"

 

john..

Posted
15 minutes ago, john87 said:

OP stated; "so i need to get the whole road length that i am working on sectioned off"

 

john..

OP actually said:

 

so i need to get the whole road length that i am working on sectioned off or can i use 2 guys with stop go boards,

 

So was asking an either/or question.

  • Thanks 1
Posted

If it’s 30mph or below, cones and signs should be sufficient.  Usual caveats apply, ie, all operatives should be trained and competent for the task in hand, so holding a current street works qualification. 
If it’s above 30, you could ask to have the whole lane off under lights and just pull one head in, reducing the overall length, as you clear each street light. 

Posted (edited)
1 hour ago, petercb said:

OP actually said:

 

so i need to get the whole road length that i am working on sectioned off or can i use 2 guys with stop go boards,

 

So was asking an either/or question.

Exactly, and as I said, a big difference between the two.

 

Road closing orders, diversions in place, notifications of the closure, etc, etc, full road closure is a big deal.

 

Whereas closing one lane and operating traffic control of whatever kind in much simpler.

Edited by coppice cutter
Posted (edited)

Pretty simple, what authority do you have as a company/individual/sole trader and so on to cone off the road and start controlling the traffic flow? None I would suggest without the correct training, signage, traffic control equipment and council issued permits etc.

 

Perhaps if you presented a professional approach and detailed costings to the works within your tender this could stand you more chance of winning it? Its not always a race to the bottom. 

 

I work on around £1000 inclusive of permits and traffic control measures in the Hertfordshire area.

 

Ps don't pay for a visit any good company can do all required online.

 

Good luck with it anyway. 

Edited by Chipperclown
  • Like 1
Posted

Christ £1000. Did a job a couple of months ago with traffic management controlling traffic with 2 way lights on A120 in Essex so all had to go through Highways England, after hours so 20.00 to 5.00 all in £550.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.