Jump to content

Log in or register to remove this advert

Unusual job


son of a birch
 Share

Recommended Posts

Hi all,

 

I just wanted to see if I could brainstorm some ideas for a job coming up.

 

Not sure on the full details at the moment, but basically we have to get a cameraman into a tree to install some camera equipment. He is not a climber and lets assume that we could not install the equipment ourselves.

 

Also, for arguments sake, lets assume that the desired height to install the equipment is out of ladder reach, out of mewp access, and that the tree is fairly tall with a clear stem (so not easy to scramble up). So we will be using some form of rope access.

 

Any ideas of how we could get a guy into a tree, aside from a crash course in hip thrusting? Any particular belay/ pulley system that would be suitable?

 

Thanks in advance for any ideas (also please note I haven't visited the site yet so can only speculate on tree species/height etc)...

 

Chris

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 23
  • Created
  • Last Reply

Top Posters In This Topic

i have a mate (former arb) who does this for a living freelance and is a bit of a pro when it comes to hoisting fat camermen into the canopy - pm me if you want his details - he's in bristol. Suppost this is your job though! He's a helpful kinda chap but its his livelihood if you know what i'm saying!!!!

Link to comment
Share on other sites

Use a second climber as a counterweight. He'd have to be roughly the same weight as the cameraman and his camera.

 

Have the second climber at the top of the tree attached to the same rope as the cameraman at the foot of the tree (rope is through pulley positioned at suitable high tie in point).

 

The cameramen should have a secondary safety line which is through a belay device at the base of the tree - gri gri/grillon etc. This will be tended by a groundsman. This rope will also be through a separate pulley at the top of the tree near the 1st main tie in point.

 

The second climber would also have a secondary safety line in the form of his usual Doubled rope system. His tie in point will be in a similar location to the other to tie in points. This allows for the controlled descent of himself and the controlled ascent of the cameraman.

 

As the second climber descends from the top of the tree the cameraman rises to the point where he is to set up his gear. This may mean the second climber hanging around in mid air for a short time.

 

The cameraman is lowered by the second climber ascending using his doubled rope system. Again the cameraman's safety line is belayed by the groundsman bringing him safely to the ground.

 

 

 

.

Edited by scotspine1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.