I can process 16 ton of green wood (ash, sycamore, alder) a day with two people in an 8 hour day, that is good straight wood mix of 4-14inch diameter, that is with a Posch 300.

You can split up to 18 inch rings in the splitter which is handy.:thumbup1:

Edited by posch jon
Link to comment
Share on other sites

Thanks for the replies guys. I think the big learn is sorting the timber prior to starting so you're not having to manhandle the larger stuff, put the split stuff back through etc. Its also our first season with the machine so we are still getting used to it.

 

Many thanks guys.

Link to comment
Share on other sites

Two of us can do 15 -20 cube a day packed into 1.5m3 nets(8 hours) if timber is all the same size (10 -12" best) and very straight. thats with a hakki 1x42 and a homemade log deck with a hydraulic infeed on it, loaded with a timber crane.

I try and keep the processor going the whole time while other person loads wood, sets nets up, moves full ones etc.

Link to comment
Share on other sites

I am new to processing and first attempt did 4 tonnes in a day. However, i got organised, sorted the wood into similar diameters and tidied lengths up. Big rings i saved and just used the processor as a splitter, and can now fill 5 1.5 tonne potato crates in a day with logs at 10 inch. I have considered just using the processor to produce billets as the 10 inch logs tend to twist in the splitting trough and the last log is always hard to cut. I got depressed at the initial slow process as it didn't seems much quicker than the old method, however, I can get up the next morning and do the same again instead of lying there thinking someone had battered me the night before :) I deal in Arb waste and i really do get all sorts, i presume if i got top notch cord wood then i would be much quicker.

Link to comment
Share on other sites

  • 2 months later...
Ifor Williams make lots of different size trailers, what size are you talking? Are you logging and splitting in that time?

 

 

Twin axle, 2.2m3 to the top of the solid level on there. That is only split though, not sawn, not stacked, just split and lobbed in. Don't know how long I could keep that up for though. We aren't efficient enough yet to dedicate several days to processing and only tend to do odd amounts here and there. This year will hopefully be different though.

Link to comment
Share on other sites

once diced up we produce 1cu metre an hr with one man operating our vertical splitter. 6 hrs is enough . So with 2 men working a processor you need at least 3 cu an hr or its not worth owning a processor. Ours is rated 6 cu an hr but 4 is more realistic especially with 3" sticks drops even more.

Link to comment
Share on other sites

once diced up we produce 1cu metre an hr with one man operating our vertical splitter. 6 hrs is enough . So with 2 men working a processor you need at least 3 cu an hr or its not worth owning a processor. Ours is rated 6 cu an hr but 4 is more realistic especially with 3" sticks drops even more.

 

how many cube in an area that is 4m sqr x 2,m deep :blushing:

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.