Jump to content

Log in or register to remove this advert

Biggest C*ck ups on quotes...


Clutchy
 Share

Recommended Posts

So, whats the biggest cock up you've made on a quote?

 

So today we turned up to a job we quoted 1.5 years ago (Subsidence case, took ages for them to allow the fell due to TPO) to take down a twin stem Ash. Didn't bother adding the normal 10% as we have worked for him before at other properties.

 

Quoted in Winter 2019 where we had to lower our prices a bit, couldn't fully see the size of the base (Fence covered it and owner decided to go out before our appointment) and was covered in Ivy. Quoted £975 inc VAT estimated it would take a day, be gone by 2pm 1 van of chip, 1 logs. Not great money I know but was a noob back then. 

 

Holy shit, took 1.5hrs to get to Hampstead today, the stems hidden by the Ivy were huge as was the base. Got 50% of the brash down today and some of the front stem. 1 Full van of logs, 1 of chip, going to easily be there another full day, maybe even a third! At least 2 more loads of logs and another for chip 😭 Lots of it needs rigging.

 

Wouldn't dream of saying we need more money, just gotta suck it up I suppose. Not had a bad one like that for a while 

  • Sad 2
Link to comment
Share on other sites

Log in or register to remove this advert

6 minutes ago, Clutchy said:

So, whats the biggest cock up you've made on a quote?

 

So today we turned up to a job we quoted 1.5 years ago (Subsidence case, took ages for them to allow the fell due to TPO) to take down a twin stem Ash. Didn't bother adding the normal 10% as we have worked for him before at other properties.

 

Quoted in Winter 2019 where we had to lower our prices a bit, couldn't fully see the size of the base (Fence covered it and owner decided to go out before our appointment) and was covered in Ivy. Quoted £975 inc VAT estimated it would take a day, be gone by 2pm 1 van of chip, 1 logs. Not great money I know but was a noob back then. 

 

Holy shit, took 1.5hrs to get to Hampstead today, the stems hidden by the Ivy were huge as was the base. Got 50% of the brash down today and some of the front stem. 1 Full van of logs, 1 of chip, going to easily be there another full day, maybe even a third! At least 2 more loads of logs and another for chip 😭 Lots of it needs rigging.

 

Wouldn't dream of saying we need more money, just gotta suck it up I suppose. Not had a bad one like that for a while 

There was someone on here a while back who quoted to , I think , reduce a long hedge . He got about half of it done and quit I seem to remember . Someone else finished it off . least I think that is how it went .

Edited by Stubby
Link to comment
Share on other sites

2 minutes ago, Stubby said:

There was someone on here a while back who quoted to , I think , reduce a long hedge . He got about half of it done and quit I seem to remember . Someone else finished it off . least I think that is how it went .

I cannot tell you how tempting it was to jump back into the van and go home this morning 

  • Haha 1
Link to comment
Share on other sites

10 minutes ago, Stubby said:

There was someone on here a while back who quoted to , I think , reduce a long hedge . He got about half of it done and quit I seem to remember . Someone else finished it off . least I think that is how it went .

Ben it was,  i think. Sorry Clutchy thats fvvkin eyewatering  🙁 K

  • Sad 1
Link to comment
Share on other sites

Conny has to be the most common price cock up, certainly is for us. 

 

I'm so scared from misjudging the depth/width of them previously and having super long days that I think we now overprice ourselves out of ever winning them! 

Link to comment
Share on other sites

Just now, Clutchy said:

Conny has to be the most common price cock up, certainly is for us. 

 

I'm so scared from misjudging the depth/width of them previously and having super long days that I think we now overprice ourselves out of ever winning them! 

Consider that a win then.

I price for removal/grinding/replacing usually, I only do reductions when I’m short of work, it’s hard, gutty graft.

Still do it though!

  • Like 3
Link to comment
Share on other sites

4 minutes ago, Mick Dempsey said:

Consider that a win then.

I price for removal/grinding/replacing usually, I only do reductions when I’m short of work, it’s hard, gutty graft.

Still do it though!

Yeah definitely prefer removals.

 

Especially as customers so often want a 20 meter tall Conifer hedge reduced to 7 meters but 'I still want it to look nice' - well you can't 😂

 

So much chip comes off them as well

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.