Jump to content

Log in or register to remove this advert

walkerboys

Member
  • Posts

    372
  • Joined

  • Last visited

Everything posted by walkerboys

  1. Now this is why I put it on arbtalk there's always some great advice 👍👍 glad you all have the same thoughts as me I lost a job I put the tpo application in for because it was that much cheaper for the council to do the job the home owner just paid me for the application a 3 day job the council priced it for 1 day but it took them 4 days to get it done we all miss price jobs from time to time but the council will never learn because they have nothing to lose
  2. The councils are all corrupt if work was contracted out that £400k a year would be less than halved
  3. So surely are council tax should go down if there making money but yet that won't happen I'd rather them sit round drinking tea than lowering all our prices
  4. My mate in the council said all in there 3 man team costs £400k to run a year
  5. It's the tree officer that's pushing it every tpo job that he approves gets a quote sent with the confirmation
  6. They can lose on every job but through the council books it's 100% profit as the teams,gear,trucks,Chipper's and stump grinder is already paid for by the tax payer if a 1 day job takes a week it doesn't matter
  7. It's 100% true they run one team now doing council work and private work now there putting a second team on the road to do private/contracting work could this be stopped they put a price in for every tpo job and obviously it doesn't matter if they make a profit off the job because the council tax pays for the teams to run so if they quote cheap it doesn't matter
  8. Hi As the title says my local council is doing paid works so every tpo application that goes in to the council they send a quote to do the work and will there be a bit of well if you give us the work we will grant permission going on? is this a common thing and is it a good use of tax payers money I'm just looking for a few opinions on the situation Thanks 👍
  9. As title might be a daft question but who's the uk fae dealer Thanks in advance for replies
  10. Prices are area dependent round here man and grinder will be £350-450 for the day that's with a good machine
  11. Have a look on the unimog rocks thread for skyhooks chipper mog trailer set up you won't find a much better set up than his. A C price is your man to speak to I used Atkinson vos a few times aswell they sell realy good chip boxes
  12. Do you have any pictures of it in action
  13. Hi this has probably been covered but does anybody have 1 what make and how good?got a price off seppi today and it was a suprise with all the bells and whistles £16990 £15500 standard I rang Rikco and there not selling them at the moment is there any other options?want to keep my Carlton 4012 for domestic didn't realy want to put 30k in a 7015 Carlton or big bandit Thanks mark
  14. That's what I think they are worth. it is the same round here firms sending climber and a groundie out with van and chipper for £300 -£400 a day and it's not enuf the groundie will be on £50 and climber £80 a proper tree surgery team should be £500 minimum there's to meny willing to under cut!afew of my mates are plumbers sparckeys and teacher and wouldn't even think about setting off for less that £150 a day tree work deserves To be the same level
  15. Surely in this day and age a good groundie would be worth £100 a day fully ticketed up with b+e and a good climber £120 just my opinion and also you just have the £50 a day brash draggers don't confuse them with a good groundie
  16. I like that the conveyors save a lot of horse power compared to blowing chip
  17. Bandit all the way but are heavy well built chippers backing it up mite give the clutch on your van some pain
  18. Very good thread love mogs not sure if I would have anuther my old 1 has come up on eBay after a engine rebuild they do eat money but can make it aswell
  19. Have a look at Atkinson vos website they used to have full tp range and web site
  20. Burnley auction has a lot of ex council, utility's and electric board stuff normaly or foe ex army can be found on I bidder or bid spotter
  21. Was it a bearing salesmen who told you that I always purge bearing il grease the main bearings on my grinder 4 or 5 times a day if it's flat out all day
  22. Haha no worries think we fit 8 or 9 on a trailer load so stripped the bases rope in the ones that were leaning back me and nick are 17 stone a peice so can fairly pull on a rope we finished it today there's a massive pile of logs I've talked the bloke in to getting a man and processer in there's not much over 14 inch
  23. Very true but saves hand balling it all my mates going to come with his processor for the client
  24. All the wood is staying aswell had 1 person ask about wood and the owner saw this and said it has all got to stay he wants it all

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.