Ropes for crane work?


gibbon
 Share

Recommended Posts

I have been thinking of using db rope instead of slings as attachments for crane work? What I was thinking was 4 x 3or4m 16mm ropes, 1 or 2 on each chain. It would be cheaper than slings and more versitile allowing various combinations of knots and half hitches to balance brash. I always switch to chains for big lumps of timber.

 

Anyone use ropes like this instead of slings? Any pros or cons?

Link to comment
Share on other sites

Log in or register to remove this advert

i also use red 5 t slings on lumps of timber, im not one for chains used them once and found it really clumbsi- but thats my opinion. got a selection of small 1 t and 3t sling for smaller limbs. i have tried it out using a 8m length of 16mm marlow double braid so that i could tie off limb at tip and close in then put a "sling prussik" at middle point. only the once as it was over a fully glazed swimming pool building!! i personally feel that slings is so quick and in my eyes safe when using large equipment.:001_cool:

Link to comment
Share on other sites

only rope i use would be on a tag line,did toy with the idea but 5 ton slings are not that expensive and i dont think i know a crane driver who would be happy with using rope....they have asked me to switch to chains on big timber before instead of slings!

Link to comment
Share on other sites

I use ropes for most things..

 

Slings for the easy stuff.

 

Chains for normally soft stops for the Trunk wood.

 

 

They call them "Spider legs" in the states.Typically I use two 6meter and two four meter ones.I use Kernmantle Yachting Rope with a double figure eight tied to form an eye.When all legs are balanced thats and eight ton SWL.

Link to comment
Share on other sites

I find chains so much easier to use then slings or ropes. For example, why carry the chain and a sling out to the end of a limb when balancing when you only need the chain. They are easier to disengage on the ground. Slings are difficult to use when wet and/or old and chains are easy to adjust with an extra wrap or shortening clutches. However, if you are new to craning, I would always recommend using slings.

Link to comment
Share on other sites

i have only ever used chains on crane work , i find them easy to adjust and much quicker for cradle work , i tend to use double chains for bigger timber as it increases the crontrole , but depends on how you cut i guess , i tend to use alot of step cuts and single cuts strait through . but good luck trying the rope system , let us know how you get on , with some pictures mybe ??

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.