Tarmac Track - Price


Commando
 Share

Recommended Posts

Log in or register to remove this advert

Like Egger says, tarmac likely to have a hefty price tag but reasonably quick to instal and no big delay in use after laying. 
 

Any way of making a temp access route that would allow light traffic for a short period whilst a slower to instal but cheaper than tarmac option was laid down?  - prob enough money saved to lay down and take up a temp access (803, Woodchip?) and still have money left over. 
 

Depends on space etc obvs. 
 

What about a granular confinement system (web cell) and loose infill?

 

Id try anything before tarmac, it’s expensive and not great environmentally. 

  • Like 2
Link to comment
Share on other sites

27 minutes ago, kevinjohnsonmbe said:

Like Egger says, tarmac likely to have a hefty price tag but reasonably quick to instal and no big delay in use after laying. 
 

Any way of making a temp access route that would allow light traffic for a short period whilst a slower to instal but cheaper than tarmac option was laid down?  - prob enough money saved to lay down and take up a temp access (803, Woodchip?) and still have money left over. 
 

Depends on space etc obvs. 
 

What about a granular confinement system (web cell) and loose infill?

 

Id try anything before tarmac, it’s expensive and not great environmentally. 

Is there an environmental option.... green concrete? ? I guess I could have a quiet chat (blood is biodegradable right?)with the selfish tw@s that have moved into the land at the end of the lane and established a fookin animal sanctuary (planning applications to follow no doubt!)...90% increase in traffic?

  • Haha 1
Link to comment
Share on other sites

5 minutes ago, Commando said:

Is there an environmental option.... green concrete? ? I guess I could have a quiet chat (blood is biodegradable right?)with the selfish tw@s that have moved into the land at the end of the lane and established a fookin animal sanctuary (planning applications to follow no doubt!)...90% increase in traffic?

Shared access and mutual maintenance costs?  Always a drama ?

 

Slaughter them all and bury them in the new road!

  • Like 1
  • Haha 1
Link to comment
Share on other sites

I worked it out on the information available, minimal prep, so repair potholes, sweep it off  then overlay the original drive.

 

450 meters * 3 meters = 1350 Msq @ £40/ meter = £54k.

 

Would be another £15-£20 meter if not more if sub base was required.

Edited by eggsarascal
  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.