There is no 3 phase here and the 11Kva single phase transformer on the  wooden pole is approx 150 m away.

 

So probably I should be looking at a diesel generator, capable of running an 800 - 1200mm mill and edger and other bits and pieces.

 

I have been offered an 'old school' generator rated at 27.5 kw with a Gardiner 5.5 ish Litre engine and Maudsley alternator.

 

There is a wierd device the size of a shoebox attached with a winder knob on the front and 2 x 2" diameter x 12" long tandem vertical coils of wire coiled tubes in the back that a T bar moves up and down when you twist the knob at the front.

 

Anyone know what the shoebox is, what Kva it will actually produce all day long under constant load and what it is worth ?

 

Is it worth buying ???

 

The whole setup is mounted on some hefty RSJ's, came from a sawmill 30 years ago and it starts on the button and runs sweetly.

 

Deciding what Kva to buy is not straightforward, as I know diesel generators cannot supply the rated Kva continually all day / 8 hrs.

 

NEW diesel generators are relatively inexpensive and very fuel efficient, so perhaps worthy of consideration ?

 

 

 

Edited by arboriculturist

Log in or register to remove this advert

Posted

5.5 liter engine running all day long? Wonder what that drinks? 

 

You never mentioned the cost of this beast but couple that with the extra fuel it will require over a smaller modern diesel I wonder how quickly a modern transformer would pay for itself just in fuel saved? 

Posted
  On 04/04/2020 at 11:31, arboriculturist said:

There is no 3 phase here and the 11Kva single phase transformer on the  wooden pole is approx 150 m away.

Expand  

How many wires run to the transformer? I think you mean 11kV.

 

The nearest mill to me had a 54" Stenner and a 48" resaw and that ran off the engine from a Uboat.

  • Like 3
Posted
  On 04/04/2020 at 12:53, openspaceman said:

How many wires run to the transformer? I think you mean 11kV.

 

The nearest mill to me had a 54" Stenner and a 48" resaw and that ran off the engine from a Uboat.

Expand  

Sorry, of course it is. 11,000 v. Just 2 - single phase unfortunately.

 

I have not seen an U boat engines advertised locally recently. 

  • Like 1
  • Haha 2
Posted (edited)
  On 04/04/2020 at 11:34, trigger_andy said:

5.5 liter engine running all day long? Wonder what that drinks? 

 

 

Expand  

That will probably be just as economical as modern stuff, it's a ploder and built to last for ever.
Proper british engineering.

Edited by scraggs
  • Like 3
Posted
  On 04/04/2020 at 13:08, scraggs said:

That will probably be just as economical as modern stuff, it's a ploder and built to last for ever.
Proper british engineering.

Expand  

Still, would be good to get some actual figures. 

 

Whilst I agree it will be much better built I wonder what Kw is actually required as 27 could well be in excess where as a smaller unit might be better suited, but would of course have a significantly smaller engine too.

 

Just curious and would be good to see.

Posted
  On 04/04/2020 at 12:53, openspaceman said:

How many wires run to the transformer? I think you mean 11kV.

 

The nearest mill to me had a 54" Stenner and a 48" resaw and that ran off the engine from a Uboat.

Expand  

Now that would run one hell of a sawmill, 3000HP!  I bet it is great engineering.  I want one.

Posted

Get a big wire.
150m is not a big distance.
If you can do some of the installation work it would bring the price down a lot.
Is it on your land?
Single phase will run most bandsaws.
11kw is a lot of power.
And if you've got mains, then it'll work out soooo much cheaper than diesel for running costs.
[emoji106]

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Read more  

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.