Jump to content

Log in or register to remove this advert

Recommended Posts

Posted
2 hours ago, muttley9050 said:

4 days of logging fills the log shed. And while my mates botek was here I got him to line up 3 ash and one big oak for Milling next week.
20210907_163039.jpeg20210907_163103.jpeg

Love it!

Log in or register to remove this advert

Posted
2 hours ago, Rough Hewn said:

Started on a Wych elm marathon today, 10’x2’++ in to 60mm slabs with the 60” panther mill and the stihl 881.
IMG_1631036062.304307.jpgIMG_1631036080.499347.jpgIMG_1631036092.023607.jpgIMG_1631036105.903990.jpgIMG_1631036117.201670.jpgIMG_1631036130.425348.jpgIMG_1631036149.014380.jpg
emoji106.png

Do love them colours. 

  • Like 1
Posted
14 hours ago, Bob_z_l said:

I was looking at adding roller wheels to my panther mill. 


I was going t use cheap skateboard wheels on an extra long M8( I think) slotted in the rail. 
Might need to bush out the bolt... to be seen as I've not done it yet.

Yeah, I'm sure it could be done a few ways but I've no experience of what the difference might be like.

 

If it was something you wanted to try a couple of inches of rail protruding backwards towards the saw would be ideal to mount a 1 off roller alternative, I'd imagine the more the diameter of the wheels the bigger the advantage.

 

But on the other hand I don't see why you couldn't just modify the existing skid by welding on a bush to accept an 8mm bolt giving you a simple bolt on alternative when you feel you need it and at the same time you could / would beef up the Panther skid which looks a bit puny compared to the Alaskan, cheers 👍

  • Like 1
Posted
2 hours ago, Rough Hewn said:


You’re right, they’re a bit wash boardy…🤣
Lost a few teeth on the chain, can’t find another one…shhhh no one will notice…
🤣emoji6.pngemoji106.png

I once explained to a man that it gave more surface area to the board and helped it dry faster. 

The reality was that it was the second last bit on a fairly gritty ex roadside ash and I wasn't arsed sharpening the chain again.

Not saying he believed me, but he bought the board!

  • Like 2
  • Haha 3
Posted
4 minutes ago, Rough Hewn said:

Another very tasty 10’x3’ Wych Elm…
60” panther mill and Stihl ms881emoji106.png
IMG_1631126574.197009.jpgIMG_1631126591.791622.jpgIMG_1631126607.037314.jpgIMG_1631126624.299366.jpgIMG_1631126639.447462.jpgIMG_1631126653.409264.jpgIMG_1631126671.277338.jpgIMG_1631126684.708923.jpg

Beautiful timber .

  • Like 4
Posted
1 hour ago, Rough Hewn said:

Another very tasty 10’x3’ Wych Elm…
60” panther mill and Stihl ms881emoji106.png
IMG_1631126574.197009.jpgIMG_1631126591.791622.jpgIMG_1631126607.037314.jpgIMG_1631126624.299366.jpgIMG_1631126639.447462.jpgIMG_1631126653.409264.jpgIMG_1631126671.277338.jpgIMG_1631126684.708923.jpg

Gorgeous! The wood as well. 

 

@Rough Hewn    how long is it taking to go through that with the 881 any idea per board? Just wonder how much faster it is with that size saw. I appreciate there are all sorts of variables but it would be interesting to know the average time it takes to cut a board in that length.

  • Like 1
Posted
Gorgeous! The wood as well. 
 
@Rough Hewn    how long is it taking to go through that with the 881 any idea per board? Just wonder how much faster it is with that size saw. I appreciate there are all sorts of variables but it would be interesting to know the average time it takes to cut a board in that length.

About 6 minutes with a sharp chain I’m guessing?
It takes much longer to load it into the van.
I timed a cut once, it was solid oak 12’x3.5’.
Took 11 minutes with an 880 48” duromatic and chilaskan.
Today we did 9-10 cuts in 3 hours including set up and loading in to the van.
No breaks.
One nail, one sharpen.
And that’s 3 of us going at it.
[emoji106]
  • Like 3
Posted
6 minutes ago, Rough Hewn said:


About 6 minutes with a sharp chain I’m guessing?
It takes much longer to load it into the van.
I timed a cut once, it was solid oak 12’x3.5’.
Took 11 minutes with an 880 48” duromatic and chilaskan.
Today we did 9-10 cuts in 3 hours including set up and loading in to the van.
No breaks.
One nail, one sharpen.
And that’s 3 of us going at it.
emoji106.png

6 minutes. That's going some. 9-10 cuts in 3 hours. That is also impressive. Good to know. :thumbup:

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.