Jump to content

Log in or register to remove this advert

Recommended Posts

Posted


What was the job here? Good ol size tree.

It's a truly massive oak and we were starting a heavy retrenchment of side limbs incorporating fracture pruning in places, removed deadwood and take out a few elongated leaders and vertical growths from old wounds, it's a ongoing project to try and retain the tree.

Log in or register to remove this advert

Posted

It's a truly massive oak and we were starting a heavy retrenchment of side limbs incorporating fracture pruning in places, removed deadwood and take out a few elongated leaders and vertical growths from old wounds, it's a ongoing project to try and retain the tree.


Looks interesting, that's the sort of job which make arb work a good day out.
Posted
10 hours ago, woody paul said:

All the trees I have done with MEWP which are take downs you only need max height when for the first half a dozen cuts so most times i have just climbed last bit topped out then used MEWP to do rest.

Tele booms are a waste of time you need bendy boom to reach over and under. 

Not exactly true a straight stick will give you more lateral out reach and top height as you do not have weight in the boom for articulation.

straight tele will have no projection of the turret into the carriageway if on highway work and can stay within the vehicle profile it also allows you to poke through gaps in telephone wires between branches and trees.

you don't always need to go over most of the time you can reposition and get a whole large tree from 2 sides on reduction work and a tele can certainly get you under the canopy of a tree .

i think size and weight are important 3.5 ton any body can drive it on a class b licence.

The large 70m machines are great but possibly a bit overkill for tree Work in this country ,large set up profile and weight are all factors as well as cost to both hire or buy

tracked have their advantages but it's the transportation to site and set up time are factors.

we have a 27 on a cabstar with m+s tyres on and it is good off road ,not a mog or landy but we have pvc groundboards if necessary and because of its low weight and relatively small size we can get it in.

Different jacking configurations can make a machine more versatile too.

on a 3.5 ton machine it's a comprise between articulating and top height if you want more than25m articulated then your at 7.5 ton upwards.

  • Like 1
Posted

We used a 40m strait stick to do a load of Tree Removals in Brixworth 

The wheel base was wider than the road closure so we had to have one wheel on the grass which was a bit twitchy 

IMG_4425.JPG

Posted

for tree work your need up and over (articulated)  for best results.the Nifty 17 metre was a bit lacking here but the Cela Dt24 has 14 metre up and over  (12 metre) and also has  the ability to go 4 metres below grade as well.

 

Posted
Not exactly true a straight stick will give you more lateral out reach and top height as you do not have weight in the boom for articulation.
straight tele will have no projection of the turret into the carriageway if on highway work and can stay within the vehicle profile it also allows you to poke through gaps in telephone wires between branches and trees.
you don't always need to go over most of the time you can reposition and get a whole large tree from 2 sides on reduction work and a tele can certainly get you under the canopy of a tree .
i think size and weight are important 3.5 ton any body can drive it on a class b licence.
The large 70m machines are great but possibly a bit overkill for tree Work in this country ,large set up profile and weight are all factors as well as cost to both hire or buy
tracked have their advantages but it's the transportation to site and set up time are factors.
we have a 27 on a cabstar with m+s tyres on and it is good off road ,not a mog or landy but we have pvc groundboards if necessary and because of its low weight and relatively small size we can get it in.
Different jacking configurations can make a machine more versatile too.
on a 3.5 ton machine it's a comprise between articulating and top height if you want more than25m articulated then your at 7.5 ton upwards.

Interesting viewpoint. Can you post some photos of yours in action.

How much side reach does your 27m have.

27m on a 3.5t truck is big from what I can find on the internet.
Straight booms seem to cost more though.
In case of Teupen like mine there is a €20k difference between the 24m like mine 25m straight boom.

I'd agree that the advantage truck mounts have is set up time.
Pull up in truck, legs down, tele boom out, crack on.
Our takes 10-15mins to unload from trailer and then 5mins to unfold the booms (for most situations first one needs to be upright).

Regards Neil



Posted

27m on a 3.5t chassis sounds terrifying.

I used truck mounts extensively back when I was working in telecomms.

A 22m machine would be on a 7.5t chassis.

Most commonly used 34m Brontos on a 17.5t chassis.

Occasionally used 60m machines which had a 42t chassis. Looked like a Dinky toy at full stick.

That was £1500/day to hire back in the late '90's.

Posted
1 hour ago, Mark Bolam said:

27m on a 3.5t chassis sounds terrifying.

I used truck mounts extensively back when I was working in telecomms.

A 22m machine would be on a 7.5t chassis.

Most commonly used 34m Brontos on a 17.5t chassis.

Occasionally used 60m machines which had a 42t chassis. Looked like a Dinky toy at full stick.

That was £1500/day to hire back in the late '90's.

Not really terrifying at all Mark we've had ours 6 years and it's not toppled over once !! ,good going really,they have just progressed with quality of steel and different bending profiling of the boom shape to give more strength with less weight we use ours as a one man machine which gives you maximum outreach of 15 m .

They are a quality German manufacturer Ruthmann who have just this year brought out a 29 m straight telescopic with 16m outreach on a 3.5 ton they also produce a 25m with a fly jib on a 3.5 ton with 16.4 m outreach .

3.5 ton is a huge market rental wise in Europe hence the competition and developments.

I agree the old 34 m brontos we bomb proof but on 18 ton Ruthmann now do 33m on 7.5 ton with 22m outreach now that's a lovely machine but £160-£170k new.

  • Like 2

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.