Jump to content

Log in or register to remove this advert

How much Arb "waste" can you process in a day?


benedmonds
 Share

Recommended Posts

needs 1,sawing 1, splitting ,you wont make much paying 2,wages out ,to max profit you need to do it your sen ,thats what i do ,or get them logging wen they have an early finish,get yr moneys worth out of them if yr paying them for 8hrs have them earning for 8hrs :biggrin:

 

I agree, my lads saw up when they have a few hrs spare, or even on the job sometimes, :thumbup1:

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 34
  • Created
  • Last Reply

Top Posters In This Topic

I used to leave one guy doing logs when I was busy with other stuff. (arbtalk) He used to average 8-10 cube a day sawing the cord and splitting with a pto splitter.

 

 

When I used to get left at the yard on my own with a splitter I think 8 to 10 was around what I managed

Link to comment
Share on other sites

I used to leave one guy doing logs when I was busy with other stuff. (arbtalk) He used to average 8-10 cube a day sawing the cord and splitting with a pto splitter.

 

 

When I used to get left at the yard on my own with a splitter I think 8 to 10 was around what I managed

 

Normally it is a bit here and there but we need to get a decent stock pile. I've only ever done a few for myself and it didn't seem to take that long..

 

It is the first time I have left them at it, and I will admit I was rather dissapointed with their output.

Link to comment
Share on other sites

2 of us do 9 cu metres in 5 hrs on a saturday morning. Arb waste can be heavy going especially the bits that look like an octopus. We tend to get 3-4ft wide butts of beech 10ft long. The 20" stuff is too big for our processor but with good chain saw and splitter I dont think it is alot slower than 8" cord and you get alot more wood for your money.

Link to comment
Share on other sites

we cut all arb waste into 8/10" rings on site, any large dia stuff gets halved / quatered.

 

back to the yard, sorted into hard or softwood.

 

my lads then split them, i allow 1 cube per man hour, any more they get a bonus, any less, i want to know why.

 

sometimes, on a weekend they'll split on their own time and i pay them £15 per cube done

 

every ones a winner

Link to comment
Share on other sites

It seems it is just the sawing that is slow. They split everything they had sawed in under an hour. I guess they were sawing lots of small stuff. Two guys filled the same trailer that took the best part of a day in two hours today.

Bigger rings will take more splitting I suppose.

 

We only do the minimum of cutting on site, so when we have a tractor on site they can be pretty big lumps. I think it is the smaller stuff which is taking the time to process. We will have less and less of that as we've have a 10inch chipper now, that we didn't have when this wood was piled up.

Link to comment
Share on other sites

sure hoping i didnt read that right - or we are just really tight on our estate....

 

hoping the 10 inch stuff dont go through chipper, we keep pretty much everything down to 3 - 4 inches for firewood. does take some time to deal with though

 

We pay top money for cordwood and I would say 20% is under 3 inches. Trying to cut 2" sticks with a processor is ball aching with a cahinsaw must be hell. Maybe you could gather all the sub 4" stuff and get a machine in for a day ie saw bench.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.