I read the threads about people doing hundreds of cube a day on there fancy machines, using straight timber.

 

I don't have that I have big piles of logs from tree surgery. What sort of quanities should a couple of guys be able to process with arb arisings, using a chainsaw and a PTO mounted splitter?

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 34
  • Created
  • Last Reply

Top Posters In This Topic

Varies a bit depending on how much sawing is needed but if it's fairly manageable pieces we can do 3 cube of 8-10 inch long logs an hour with two of us, a chainsaw and an 18T PTO splitter with 4 way knife.

 

Really big stuff (two man lift with each ring) then it's probably nearer a cube an hour if it's to saw as well.

Link to comment
Share on other sites

its a good question,,,, we manage about 1m3 with a riko 11Ar spliter every 45 mins, if its nice rings under 18inch,,,,,,, from arb waste.

I question buying in artic loads of straight firewood at £40 per ton,+ £10 per ton delivery, so a ton on average producing 1.5 cubic meters (presuming the timber was green when delivered)= I charge £80 per m3, so 1.5 m3 from the ton would return me £120,,,,after costs of,,,,,,,£50 wood,then add labour,storage(ie yard rent)fuel for delivery, cubic net bags, ,,I cant see it makes commercial sense unless you have a fancy bit of £15k kit,(processor) plus £10k worth of loader,,,,(which you need a return on) then i see why your m3 price must be £100 plus!

I think people selling arb waste firewood can afford to charge less for the end product as we`ve usally been paid to remove it, but it takes longer than processor timber!

Link to comment
Share on other sites

its a good question,,,, we manage about 1m3 with a riko 11Ar spliter every 45 mins, if its nice rings under 18inch,,,,,,, from arb waste.

I think people selling arb waste firewood can afford to charge less for the end product as we`ve usally been paid to remove it, but it takes longer than processor timber!

 

I am not so sure. I had two lads sawing all day, they managed to fill a 3.5 ton trailer and half the back of the 130 with wood ready to be split, I'm guessing only 5-7 cube. The sawing seems to be taking ages, it still needs to be split and bagged. So if one guy can spilt and bag that in a day (or two in half)it will work out at only 2 cube a man day. Bags, fuel, chain, storage, delivery etc.. I can't see much profit at £80..

Link to comment
Share on other sites

I am not so sure. I had two lads sawing all day, they managed to fill a 3.5 ton trailer and half the back of the 130 with wood ready to be split, I'm guessing only 5-7 cube. The sawing seems to be taking ages, it still needs to be split and bagged. So if one guy can spilt and bag that in a day (or two in half)it will work out at only 2 cube a man day. Bags, fuel, chain, storage, delivery etc.. I can't see much profit at £80..

 

needs 1,sawing 1, splitting ,you wont make much paying 2,wages out ,to max profit you need to do it your sen ,thats what i do ,or get them logging wen they have an early finish,get yr moneys worth out of them if yr paying them for 8hrs have them earning for 8hrs :biggrin:

Edited by Johny Walker
Link to comment
Share on other sites

I am not so sure. I had two lads sawing all day, they managed to fill a 3.5 ton trailer and half the back of the 130 with wood ready to be split, I'm guessing only 5-7 cube. The sawing seems to be taking ages, it still needs to be split and bagged. So if one guy can spilt and bag that in a day (or two in half)it will work out at only 2 cube a man day. Bags, fuel, chain, storage, delivery etc.. I can't see much profit at £80..

 

I'd say your two men sawing are either having a laugh or are using too small or blunt saws if that's all they've sawn in a day and not even split it.

Link to comment
Share on other sites

Turn your team into a 3 man team and you should manage a builders bag in approx 20mins, we did.

Splitter beside the timber, first guy gets a 5 min head start while the other 2 set up the bags, we used trestles.

Once the splitter guy gets going the saw guy keeps him fed, the other guy passes big lumps back onto a table for splitter, fills bags, gets rings to splitter guy aswell.

When it comes to changing bags over, saw guy nips over and helps if need be, and so forth.

Thee always has to be a conductor to keep,things flowing in a team of 3 , I used to be the bagger.

Your 2 guys are either useless or lazy!

Link to comment
Share on other sites

I used to leave one guy doing logs when I was busy with other stuff. (arbtalk) He used to average 8-10 cube a day sawing the cord and splitting with a pto splitter.

 

Now we are still doing crappy arb waste but with 2-3 guys and a 30 ton billet splitter and a processor, we can do 20-50 cube a day depending on what sort of stuff we are dealing with.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.