Jump to content

Log in or register to remove this advert

How to build a pole barn?


Woodworks
 Share

Recommended Posts

Needing to make up a small pole barn to cover our mill. Made up some DF 6'x6" which have been left to dry and then soaked in creosote for a week. I am undecided on how best to fix them into the ground. Last barn I did we concreted to 6" above ground level but still get signs of rot where the concrete ends (not creo treated)

 

Some options here but maybe there are other ways? It will be liable to heavy wind loads that will try to lift it

 

Link to comment
Share on other sites

Log in or register to remove this advert

We've build shelter's on exposed sites on the limestone hills east of Bath. Treated timber rots within 5 years round here no matter which sort you go with, so this summer, we've experimented with postcreting in concrete posts and then bolting 4x4 posts to them.

 

We lost a shelter to the winds in 2012/13 not from the prevailing wind but roter turbulence!

 

We clad down to the ground (sometimes continuing with the roof pitch like the extended sides of a barn (but obviously much smaller) So they don't look ugly from the outside.

 

Good luck with your choice.

Link to comment
Share on other sites

3 hours ago, Woodworks said:

Needing to make up a small pole barn to cover our mill. Made up some DF 6'x6" which have been left to dry and then soaked in creosote for a week. I am undecided on how best to fix them into the ground. Last barn I did we concreted to 6" above ground level but still get signs of rot where the concrete ends (not creo treated)

 

Some options here but maybe there are other ways? It will be liable to heavy wind loads that will try to lift it

 

I don’t think you will stop the rot, you need to plan for it.  I have this problem with drying sheds on my site and I am gradually using steel brackets to fix the posts to concrete to allow for when the bottom of each post rots.

 

 Of course it is more difficult if you are not putting a concrete slab down.

Link to comment
Share on other sites

I built this earlier this year, concrete plinths with a metal bracket, plinths are 900mm, their hole was about a 8-900mm deep, 200mm crushed stone packed in the bottom, plinth then stone packed in around them, no ground contact for the wood 

 

D1F67C3C-8468-4D0F-A544-AAB87009CD37.thumb.jpeg.267ad81060f6cbdb06f9c1466e36001f.jpeg

 

8DBC7584-8655-4DBF-90EC-80C813BC32D9.thumb.png.8ef8e20bf2f86c6e8b9b74dfdf6718b0.png

 

A9B6EF13-E810-4FB5-AA2C-3D1C5291B826.thumb.png.39c94e7c60426cb02404d48a6551207e.png

 

 

  • Like 5
  • Thanks 2
Link to comment
Share on other sites

That looks a class job Josh. 

 

Thanks all for replies even though I dont like what I am hearing.

 

Think I am going to keep it simple and allow for repair work later. Hoping creosoted douglas fir will hold up OK and I will keep on top of treating them at ground level each year.

Link to comment
Share on other sites

You shouldn’t have a problem with rot if you don’t concrete them in. If you used old electricity poles, dig them in to around 1-1.2meters and around 400mm up from the base notch a horizontal section to create a T shape then back fill (compacting hard every 200mm). You’ll not suffer really with rot. 
 

My friend has a barn which his grandad built which is over 60yrs old. We replaced 3 of the 12 poles about 18 months ago but that’s the first time it’s had work done other than being hit by machinery. 
 

it’s the concrete that will allow the water to sit on top and accelerate the rot. Hence why powerlines and BT poles are never concreted in place 👍

  • Thanks 1
Link to comment
Share on other sites

On 22/08/2022 at 09:53, dustydave said:

can you not get hold of any old telegraph poles - never seen one rot, other than on the inside and even then the surrounding wood is still structurally supporting.

Second the recommendation for old tele/ elect poles. Don’t put cut end into ground, use the original butt where it’s been creosoted. As others have said don’t concrete as it seals in the moisture- I use scalpings tamped in 6” layers for all gate and straining posts these days. Phots are of a building at a farm park in Evesham area I visited with kids early in year. Looked quality work and built to last.

DB53EAED-3C7F-4234-BFAB-4F59D2EBA8D4.jpeg

E2F07070-3A9A-4E51-BC5F-F6B8E479F7C0.jpeg

B460EE36-A9B4-40DD-A809-362D9467553E.jpeg

B6BD829A-831F-4A7F-AA3F-E26AFDC9D690.jpeg

8CD2F352-E6AC-4E5F-B28E-4AF1D7913F73.jpeg

Edited by dan blocker
Collins dictionary!
  • Like 3
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.