Jump to content

Log in or register to remove this advert

the 'todays job' thread


WoodED

Recommended Posts

Haha! All sorts. I say removing small dead crap, pruning a jap maple, reducing some red cedars from the bucket, yesterday, reducing a plane from over a back yard, then removing some crappy vines, then dead wooded that awesome oak. Yes I seem to get all the horrible big takedowns but it's always different and a challenge. Gotta love my crew of two. We work very well together as it should be :)

Link to comment
Share on other sites

Log in or register to remove this advert

A ancient oak failure we had to clear up this evening. Glad I was able to borrow the farms merlot. ImageUploadedByArbtalk1436564943.586604.jpg.c65ce53ac642b04a06845fdadb3fd690.jpg

 

We moved the timber into a bit of woodland copse and left it as there was a beehive and heavily decayed so good for the bugs and beasties. Also I left the stump as it was. That and I didn't fancy messing around with a 6ft stump.

ImageUploadedByArbtalk1436564931.037088.jpg.8a57aeffefb0ffc8d254a950f434026d.jpg

ImageUploadedByArbtalk1436564914.057771.jpg.a1dd794e2c19bddfab5dcadc8ab4e7e8.jpg

ImageUploadedByArbtalk1436564863.693537.jpg.f84b2f3db3c5ab485f69c2e51d85019e.jpg

ImageUploadedByArbtalk1436564830.559662.jpg.b84fc644ae35a8346f32591a324b5782.jpg

ImageUploadedByArbtalk1436564812.455938.jpg.ea0f418620b0fe09ba7d796c111ce09e.jpg

ImageUploadedByArbtalk1436564764.146683.jpg.437600bc61bfff579c7d79c17f87d2af.jpg

Link to comment
Share on other sites

Thank you, I think I'd always prefer to go lighter than the spec, but it would reach a point where I'd be taking next to nothing off!

 

I was lucky to have a couple of cracking guys on the ground to help with traffic spotting and the final fiddle.

 

 

 

 

Lovely work Adam, what was the spec?

 

Let me guess, this one took 20mins with a tea break in between? :biggrin:

 

 

 

 

Cheers mate you too.

 

Took 3 1/2 hours then we felled a failed beach tree. I'll be putting a video up soon :)

 

Spec was to alleviate root pressure so was kind of down to my own discretion, approximately 1m-3m on all laterals:)

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.