Jump to content

Log in or register to remove this advert

the 'todays job' thread


WoodED

Recommended Posts

Log in or register to remove this advert

That’s me in those shots mate.

Split the climbing with Von today.

 

Woodland centre for special needs adults where you’ve worked a few times.

 

Lucky to get the shots, we’re not allowed phones at work due to national security issues.

  • Haha 6
Link to comment
Share on other sites

49 minutes ago, Timbertom111 said:

Lovely sequoia take down from this week. All went well, apart from the slinger from the crane company. He came up in the basket to help as they insisted on massive chains. Scared of heights and only been in the job 3 weeks 🤦‍♂️

 

Pretty funny! Did he improve by the end of the day?

 

 

 

Some lump of wood, that...image.png.a0c83c68fe49a3a384f129e3b871d5a7.png

Link to comment
Share on other sites

53 minutes ago, peds said:

 

Pretty funny! Did he improve by the end of the day?

 

 

 

Some lump of wood, that...image.png.a0c83c68fe49a3a384f129e3b871d5a7.png

No not really. He was abit more of a hindrance than anything. Would of been better with one of my guys helping but contract lift they insisted on him being with me. It's gone to a local company who make high end outdoor furniture it'll be well utilised.

  • Like 2
Link to comment
Share on other sites

Did you get the weights right on the bottom? I’ve done a couple of those and the butts were surprisingly heavier than the middle stem. 

 

I’m not mega strong so all chains are heavy to me. My process:

1. Have the crane driver position the chain ends on the pith, without you on the hook.
2. Cable down until the main hook touches the pile of chain.

3. Climbing system onto the hook/ball.

4. Cable up to get you onto the plateau and until there’s only a few feet of chain on the pile.

5. Arrange the choke (secret handshake - leg one chokes onto leg two, leg two chokes onto leg one) around the edge, cabling up/down as needed. 

6. Push it all off together and it slips down over the stem like putting a heavy jumper on a child.

7. Usually only very minor wrestling to set the chains and you’re tied in to do it. Don’t let the crane driver slew or boom you around. He’ll lose the position over the pith. 

  • Like 2
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.