Jump to content

Log in or register to remove this advert

Recommended Posts

Log in or register to remove this advert

Posted
if youre tensioning the line quite a bit/lot then you will overload that absail rope, double esterlon will be stronger but will sag more

 

Which makes it unsuitable for the task does it not? static line is obvious choice for such a span as other lines would have to be overtensioned

Posted
if youre tensioning the line quite a bit/lot then you will overload that absail rope, double esterlon will be stronger but will sag more

 

But then the cost of that length of rope is likely to be unrealistic for this job. I cant imagine needing 120m of double esterlon regularly enough to warrant speading several hundred pounds on it for a job. I'd ideally like something workable for £100 but not sure if this is realistic

Posted

see your point, if thats the case then kepp the weight of the peices down or bite the bullet & invest in some 12mm dyneema or technora (it wont be that much more expensive & can replace the crapy steel cable which is currently on your landy winch) i bought 200m not that long ago and it was dead cheap, since i bought it ive used it a few times. Even with static line a 100m length is gona sag loads right up to its break strain. A millatry rigging expert once told me that a zip on the 11mm static line they used should not be used on any length over 50m due to it becoming overloaded once the nesesery tension was exerted. I am hoping to research the forces on zip lines before long but it is prooving v.expensive & will have to involve funding from several industies.

Posted
see your point, if thats the case then kepp the weight of the peices down or bite the bullet & invest in some 12mm dyneema or technora (it wont be that much more expensive & can replace the crapy steel cable which is currently on your landy winch) i bought 200m not that long ago and it was dead cheap, since i bought it ive used it a few times. Even with static line a 100m length is gona sag loads right up to its break strain. A millatry rigging expert once told me that a zip on the 11mm static line they used should not be used on any length over 50m due to it becoming overloaded once the nesesery tension was exerted. I am hoping to research the forces on zip lines before long but it is prooving v.expensive & will have to involve funding from several industies.

 

how much is dead cheap and where did you get it from please

I am needing some soon

cheers

 

Same here, would come in very handy.

 

As long as its not the same place where you get that none CE marked hitch cord:sneaky2:

Posted
I'm wandering about speedlining the timber down to the garden and would need to set up a fairly long run of around 100m. The heaviest sections would be 80-100 kg I guess.

 

Looking forward to seeing the pics of this job

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.