Swing Cheek Re-direct negative forces


TTownsend
 Share

Recommended Posts

Log in or register to remove this advert

Find out the MBS of the weakest component in your system, divide it by 11, that will give you your ‘safe working load’. for the size/weight of the peice. As others have mentioned it’s best to leave out the tape sling. To convert KN to KG simply add 2x zero’s.

Link to comment
Share on other sites

1 minute ago, TIMON said:

Find out the MBS of the weakest component in your system, divide it by 11, that will give you your ‘safe working load’. for the size/weight of the peice. As others have mentioned it’s best to leave out the tape sling. To convert KN to KG simply add 2x zero’s.

Is a safety factor of 10 not sufficient?

Link to comment
Share on other sites

to the op. can you not move the main block high enough in the tree to enable the pieces to be top tied thus enabeling the swing cheek pulley to just stop or slow the swing? it would obviously require a second rope.

Link to comment
Share on other sites

9 minutes ago, TIMON said:

 


IIRC a s/factor of ~ 11 is given for blocking down. Least it is on CS 41.
I think it is in the rigging research as well.

 

it is very hard to calculate the weight/load of the piece being lowered though.

  • Like 1
Link to comment
Share on other sites

to the op. can you not move the main block high enough in the tree to enable the pieces to be top tied thus enabeling the swing cheek pulley to just stop or slow the swing? it would obviously require a second rope.



I was just going suggest that. Definitely what I would. This really decrease the shock load to the system and really is a much smoother way of doing things.

Also for the higher up pieces if you tied them around the balance point you could just use your original anchor as they would have room to run.

Good luck man
Link to comment
Share on other sites

  • 1 month later...
On ‎10‎/‎07‎/‎2018 at 19:28, TTownsend said:

 

Can a Swing cheek pulley be used in this setup ? Currently taking down a large multi stem Norway Maple and need to stop the swing as it’s surrounding by static homes.

 

An x-ring would be just what I would need but sadly haven’t got one to hand so trying to make do. I understand swing cheek pulleys weren’t designed to take negative force/blocking but is it okay in this situation as it’s used to more to eliminate the swing and impact block will take most the weight.

 

Cheers

 

IMG_0573.jpg

 

Pretty standard setup as far as my experience goes. The angle of the rope from the centre pulley to your redirect and the amount of rope in the system can help to dissipate some of the dynamic loading when a block is dropped.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.