11 hours ago, timbernut said:


Can you not install coils in bottom of large pond/small lake? I'm sure a fella I worked for was on about installing gshp coils in his pond when he re dug/ dredged it.

Fully aware of this idea, and I might yet re-consider it,

BUT! , no free lunches,

the heat going into the dwelling house MUST pull down the water temp in the pond/lake, which I dont imagine I want,

since I wish to encourage wildlife in and around the pond.

Odd, but true.

mth

Link to comment
Share on other sites

Log in or register to remove this advert

26 minutes ago, difflock said:

Why not use this moist warm air to drive any commercially available (and grant aided?) air source heat pump, for the double-win.

Well a heat pump still costs to run so if you are dumping the warm moist air at a high enought temperature to run underfloor heating, say 40C why not go direct, there's far more heat in the exhaust than can be recirculated to the incoming air.

Link to comment
Share on other sites

1 hour ago, difflock said:

Why not use this moist warm air to drive any commercially available (and grant aided?) air source heat pump, for the double-win.

The only building I have nearby that requires heat is the staff facilities which essentially is a mobile home/caravan. It was non qualifying for RHI when we set up our scheme and if I make it nice and toasty in there they won’t go outside and split logs in the cold and wet! ?? 

 

next nearest building that can use the heat is 100+ m away and the insulated pipe work to put it onto the Rhi boiler is not worth the cost. 

 

We park the old diesel forklift next to the air vent in the shed. -5 outside and starts on the button. ??

Edited by Chalgravesteve
Link to comment
Share on other sites

  • 2 months later...

Just to add to this thread a little more. Our RHI application amendment finally came through today after being submitted back in July 2017!
Put the meter readings in and for Jan to April when we’ve been drying nearly non stop the payment is nearly 3/5ths of our entire tier 1 payments! The kiln isn’t our main heat use at all but the low temperatures and high log demand have certainly had an impact on the last quarter!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.