Jump to content

Log in or register to remove this advert

Tracked log splitter


scbk
 Share

Recommended Posts

This project has been rumbling on for a few months, almost there now!

 

It has a 9.5hp Kubota diesel

 

Still need to make a bigger table, and tidy it all up. Also got a small electric hoist I want to try out.

 

 

 

[ame]

[/ame]

 

 

:sleep1:

Link to comment
Share on other sites

Log in or register to remove this advert

Outstanding. Great idea with the main benefits being:

 

* It will transport itself anywhere

* The height of the table adjusts according to the user and the size of the ring.

 

Only thing I'd do is put a larger table on.

 

So when are you putting them into production!?

Link to comment
Share on other sites

Yes a conveyor would be nice if I had the space! :001_tongue:

 

 

Love it. Great idea, easy to put on a trailer as well

 

I've got a folding ramp permanently fitted to the van, so I can just drive the machine straight in and out :001_smile:

 

 

 

Hats off to you :-) that's perfect! Twas only a couple of days ago that I was figuring out how to mount a splitter to a tracked mini dumper. You'd better patent it quickly because I'm copying that! ;-)

 

 

I've been thinking for a long time how to improve my setup, none of the ready made splitters meet my needs of fast, powerful, very mobile, robust, and narrow access.

 

I was looking for weeks/months on ebay etc to find the right track dumper, most in this size have a smaller engine. Very nearly bought a 1ton machine but (now thankfully!) that deal fell through.

 

 

500 mile trip to get this TCP dumper. As new they did have a PTO option. Took ages to get it all figured out and then was let down numerous times, and waiting on parts.

Local hydraulics shop are very knowledgeable but also very busy and terrible at returning calls. Needed to get a cylinder repaired, various hoses made up, and the main part was an extra slice for the valve block which in the end I had to speak to the technical manager of the component manufacturer to get!

 

Relocated the battery, and fitted a much bigger one. And fitted a hydraulic oil cooler.

Quite a hard machine to work on as it's so tight for space

 

 

I had it in my head it would take a week - 3 months later and it's usable but not finished :laugh1:

 

 

Need to put a few days use on it to find the next set of faults :sneaky2:

Edited by scbk
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.