Jump to content

Log in or register to remove this advert

forestboy1978

Veteran Member
  • Posts

    1,162
  • Joined

  • Last visited

  • Days Won

    2

Everything posted by forestboy1978

  1. Do see where youre coming from. Forest drive is nice but 20 mile round trip at 15mpg with pick up and trailer, then finding there's a few sets of steps do go down or up and that slab of concrete right under the stump £72 inc is not the worth it. 10 mile round trip at my convenience through forest and you got me ?
  2. I will add.. or it can be done absolutely when I please with zero scheduling within 8-5 and a 10 day window. With all that underlined in the quote. The amount of times I've quoted for unscheduled and then they try and pin you down. Sorry sheduled is double. The quote was for UNSCHEDULED!!!
  3. Agree. Machine already out and about. And really local. Within a mile.
  4. It easy. It'll take 5 mins roughly. Just need a van to put the stump grinder into or pay for pick up and drop off or get someone in to do it. Prolly £150 ish inc VAT no clean up other than a blow around of chips.
  5. That looks like hard graft ? Like the control panel out to the side like that so you can see.
  6. ah I see. probably wouldn't take much more than that with my little camon sg30. Love that little thing. 1 hour to do an 18 inch high 4ft wide stump the other day and that was with not the sharpest edge on the green teeth.
  7. loading/ unloading grinder, travel to and from job site. unloading grinder again 50-60 quid??? He'll be lucky...
  8. As someone else suggested. Combi with carbon fibre extensions and ladders. Bill it high AF. Brutally hard work. I turn them down now. Shoulders are too buggered for the leverage. Used to hang off a 16ft tripod and do them. If people want the privacy and status of a high hedge then they can do it themselves or I want £400+ per day.
  9. Gave the option to have gov pension or waver for £2 extra per day to be included in pay.
  10. You have an annoying knack of telling me to do what I'm already gonna do ? This is catharsis.. I'm sounding out my thinking
  11. Just thinking back now to a month ago when I took a rare day off to view and work out a quote which turned out to be 9k of fencing and he bitched and moaned that I wasn't on site. Job was done by 2pm anyway and early finish. Had I been there would have been done by 11am and I would have been left with about 8 hours of travelling and admin to calculate a quote while he went home and got paid for the rest of the day... God I'm soft
  12. We have parted ways in a friendly manner. Will source a replacement ASAP. With a clean driving license. Frankly it's a weight of my mind...
  13. It's that guy. Irony is as well as moaning about his wages this morning he moaned about waking him up. Was only Thursday week i told him to be at mine at 7.50 on Monday we are on the school job in town. Last Sunday 10.20pm I get "wot time we starting tomorrow and where".....
  14. I have a few numbers of people who can do the odd day but I want someone permanent. Contacted his brother in law and asked him to talk some sense into him. His words. "probably time for the dopey cunt to learn a lesson. He wont find another job"
  15. Sheesh how? Anyway, he's got 3 hours 11 mins to get back to me a let me know if he's coming back to work. If not, I'll process his wages for the month add his annual leave entitlement and pay him and send him his p45. Need to find someone by this Tuesday...
  16. He's not a lad. He's a 30+ year old man who initially baulked at the idea of getting his own ass 2 miles down the road to work. If he wan'ts full time he's got it. He doesn't. If he wants his 22 days he'll get them if he worked full time. He works approx an average of 3/4 full time, pretty much fitted around his long weekend. He gets the proportional amount of holiday accrued for the proportion of full time work he does. Approx 3/4. He refuses to learn to drive. We still drop him home often out of guilt when possible. He gets all tips and out early. And he appreciates fuck all. I've even given him a shit ton of outdated trimmers, all my old cabled tools that have been upgraded to batteries etc etc etc. I work full time during the week, evening and nearly every weekend so he has a job. I earn probably triple what he earns for triple the hours and all the stress and financial risk. I'm not fucking mother theresa...
  17. You'll probably do financially better in life than me lol
  18. Well 22 days annual leave is prorata so he doesn't get that. He accumulates it based on how many of the 253 days in this tax year he covers. But by next April he'll have 23 possible days per year to a maximum of 26.
  19. Anyway it is stressing me out cos I just don't like this kind of bullshit above all else. It's the worst thing about being the boss.
  20. Average about 15-16 days i would think. I could actually do with someone else full time frankly now as I can't really keep up with the quotes. Funnily enough I met him through his brother in law who worked for me for 18 months and we are talking about him coming back next spring. Of course he'll earn more as he can drive, has aerial rescue, large fell etc. This is probably what is pissing him off. Everyone gets paid more than him because they can get in a vehicle and pull a trailer or whatever.
  21. Nope. Near the end of the month we discuss the following month. I always give him his days off Friday or Monday so he gets long weekends. He chooses how much more than 12 days he wants depending on his circumstances. This works well for him and myself frankly as some jobs only need 2 guys.
  22. He has a 12 day per month contract but often works almost full time. Sometimes a monday off, or a friday or whatnot.. his days range from 12 -21 per month depending on how much he wants the work.
  23. But he's not that good. He's not as strong as me so i do the harder lifting and he couldn't be left alone to do an install after nearly 2 years. New guy is 2 months and already can be relied upon for example. In short, he doesn't really get it. I like him, but he's not going to be good. Fine line between being a decent human being and screwing yourself by paying more than a persons ability justifies. Especially when they're bitching at you for this and that. And he's untrainable cos he refuses to learn to drive... I just don't get the logic of a person who agrees terms to work for you and then endlessly bitches about his awesome skills not being rewarded. I have a second job, I have a boss. We negotiated terms 4 years ago. I went in high, gave him my word that there would never be a renegotiation but I do want inflation matched. Kept my word, do my job and do it well. Never been a single issue.
  24. He works random days. Sometimes gets over time for staying on. Sometimes gets a 60% half day rate if it's shitting it down and would rather be at home early etcetera. I just run it by them to be sure we're all on the same page. I know what it is going to be but I just want to double check first. Mistakes are easily made when you're doing all your admin after a hard days work.

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.