Jump to content

Log in or register to remove this advert

Recommended Posts

Posted

Hi guys I just finished my cs41 and when I was on it the trainer showed me away of pulling over stems using:

A line tied to the top of the tree then tied off on a capstan then the bit I don't remember too well but consisted of 2 double pulleys an old climbing line and a big rope grab...

I remember the rope grab goes on the rigging line and one of the pulleys clips on to the capstan has anyone used this method and could perhaps show some pics so I can make my own kit up?! Thanks

Log in or register to remove this advert

  • Replies 21
  • Created
  • Last Reply

Top Posters In This Topic

Posted

Used something similar today to pull a back leaning stem over. Pull line tied to the top of the stem, then a pulley tied to the base of a nearby tree in the direction of fall. The pull line goes through the pulley and back up on itself to another pulley tied (by prussic and carabiner) halfway back towards the stem. Feed the end of the pull line through that pulley to give you 3 to 1 mechanical advantage. The prussic can be pushed further back up the line as the system shortens on itself. (If anyone can understand that I'll be amazed!)

I'll try and put some pics up tomorrow.

Posted

It sounds like a 3to1 set up kind of thing. Not sure if this is what your on about. Will try and get some pics. I use it to pull trees over when there's not enough guys on the deck to do it by themselves.

In a rigging situation it would effectively be the same principles just adding the capstan to avoid the top falling to the deck.

Does this sound like the kind of thing you were on about?

Posted
Used something similar today to pull a back leaning stem over. Pull line tied to the top of the stem, then a pulley tied to the base of a nearby tree in the direction of fall. The pull line goes through the pulley and back up on itself to another pulley tied (by prussic and carabiner) halfway back towards the stem. Feed the end of the pull line through that pulley to give you 3 to 1 mechanical advantage. The prussic can be pushed further back up the line as the system shortens on itself. (If anyone can understand that I'll be amazed!)

I'll try and put some pics up tomorrow.

 

 

I understood haha

Posted (edited)

Is this what you mean?

 

[ame]

[/ame]

 

What I do once I've got the tension where I want it and the priussik is holding the rigging line is to slide the moving pulley down to create slack on the working end, tie and alpine butterfly on the working end and clip in a carabiner before sliding the moving pulley back up the rigging line until it holds on the alpine butterfly/carabiner. Now the load is held on the rigging line and can't slip rather than being held on the progress capture prussik.

Edited by R Mac
Posted
This system is often used/shown on ua2.2. A very handy system to know.

 

 

That's the same 5:1 set up but instead the the end pulley was attached to the rigging line it wasn't all utilising the same rope

Posted

Quite clever, 1st time i've seen that sort off thing.

 

In pracitce is it not easier just to have a hand winch/or tirfor in van?

I'd be worried that even with the increased load it was still not enough to pull the tree over and then u've no where to go

Posted

The 5:1 system is now part of the assisted felling ticket. We used the stien system comes fully made up and ready to use. Basically on smaller diameter wood where it saves getting winch out. Other half of ticket is with winches.

 

Cheers,

James.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.