Jump to content

Log in or register to remove this advert

Recommended Posts

Posted

Any one built one. I,m building one a for next years supply. As always struggled to keep logs dry. Just wondering if any one has thoughts on how efficient at drying at centre of heap will be. Mine will be 10ft diameter. Maybe 7ft tall. Might try to do roof with layered logs to mimick thatch. As opposed to a tarp which will prevent moisture escaping.And they look really good.

Log in or register to remove this advert

Posted
Any one built one. I,m building one a for next years supply. As always struggled to keep logs dry. Just wondering if any one has thoughts on how efficient at drying at centre of heap will be. Mine will be 10ft diameter. Maybe 7ft tall. Might try to do roof with layered logs to mimick thatch. As opposed to a tarp which will prevent moisture escaping.And they look really good.

 

I have a customer who buys semi seasoned hardwood from me, and builds the logs like that to dry.

 

They swear by them. She told me it takes approx 8 hours to build.

 

I think they cheated as well, putting a large diameter perforated drainage pipe in the centre, as without it there's kept collapsing.

Posted

When you stack it, only the logs on the upper 'roof' area need to have their bark facing upwards. Easy to build and steady in high winds.

Posted

Every 3ft square I put a a 2-3ft pallet slat into rough thrown logs which sits on log built edge, as this locks face to inner core. Bricklayer for 27 years in church restoration . So just like a wall tie. Also battering walls in as this must help. just need mortar to truly solid it up:thumbup:

Posted

If you can't be bothered with all the stacking, make a ring of mesh or stock fencing, then you can just lob the logs in! :001_smile:

Posted

These things look lovely, and when complete are a good, reasonably waterproof logstore.

Trouble is, when you need to break into one you'll need to move the whole thing into covered storeage. Otherwise it becomes a wet heap.

 

Probably ok for fresh wood in the first year of seasoning, before moving to a proper shed.

I wouldn't like to depend upon it for tonight's firewood.

Posted

Someone near me has built one but they haven't sloped the roof that much or left much of an overhang. They've got a tarp on top and the water just runs off and down the face of all the logs so they look absolutely sodden.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.