Jump to content

Log in or register to remove this advert

Ditch clearance using mini digger


Essex arborist
 Share

Recommended Posts

A lot of what I would deem 'Landscapers' rates on here and no relation to actual real world 'Plant Hire'?

 

£260 per day for a 1.5 tonner and it would never move out of the shed!

 

There are also massive regional variations to rates.

 

 

Eddie.

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 24
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

A lot of what I would deem 'Landscapers' rates on here and no relation to actual real world 'Plant Hire'?

 

£260 per day for a 1.5 tonner and it would never move out of the shed!

 

There are also massive regional variations to rates.

 

 

Eddie.

 

I ask and get £260 a day me and machine, and if I don't it can damn well sit there in the yard.

 

Were I to put a driver on it, it could go out for a bit less- but nothing like some of the rates you see on eBay.

Link to comment
Share on other sites

Doubt if a 1.5 ton mini digger has enough reach to clean ditches & dykes has it? Mine need a minimum of a 5 tonner & most need an 8- 13 tonner.

Had a good few days work done last summer with an 8 ton machine & a top notch operator @£250 per day inc diesel etc.

 

That's the funny thing- big machines are three-four times as much to buy as a 1.5t yet command only a small premium in hire rate pro rata for their weight. A mini is £50/day, a 7.5t is £100/day (machine hire only) from a local place. That's why I like smaller kit, much less investment and similar rates.

 

Your bloke with the 8 tonner was a touch too cheap, even if he hired one it would be machine £100/day, operator £150 (we all agree that's a fair rate?) which doesn't leave any room for the 40-50l of diesel burnt?

 

Bottom line is this- with my skill set I can get £150 for just my labour as a subby anywhere, any place. If I provide a mini digger, whether my own or hired in, it needs to cove all the extra costs- hire, transport, fuel, insurance. Which is at least £100 a day. If you cost your labour out at that, which seems to be the norm from threads on here, then you need the same.

 

If the 'going rate' is less, I won't bother. Same with logs.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.