Jump to content

Log in or register to remove this advert

Recommended Posts

Posted

I'm getting a run of fences recently and there all a fair size. Now I normally use a petrol borer for the holes but one is 40 posts and I'm looking at one tomorrow which will be around 60 posts maybe:sneaky2: so got me thinking about hiring a mini digger with the borer on it. So guess my question is is it worth it and does it make the job easier?

Log in or register to remove this advert

  • Replies 27
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Posted
I'm getting a run of fences recently and there all a fair size. Now I normally use a petrol borer for the holes but one is 40 posts and I'm looking at one tomorrow which will be around 60 posts maybe:sneaky2: so got me thinking about hiring a mini digger with the borer on it. So guess my question is is it worth it and does it make the job easier?

 

Hell yes ! :001_smile:

Posted
I'm getting a run of fences recently and there all a fair size. Now I normally use a petrol borer for the holes but one is 40 posts and I'm looking at one tomorrow which will be around 60 posts maybe:sneaky2: so got me thinking about hiring a mini digger with the borer on it. So guess my question is is it worth it and does it make the job easier?

 

Defiently and defiantly, its the man that never gets tired, last one I hired I was digging into solid chalk and it bored the holes at 2ft @ 6in with ease

Posted

All timber fenceing hit and miss one site will probably have loads of roots and the other is a new build so could be full of back fill and crap.

Posted

I have one on a mini. It is a most excellant piece of kit and will speed up the job no end and take the sweat out of it,

With tree roots it does tend to do one of 3 things, break small roots up fine, deflect off the root and take the path of least resistance or it its a root of 3-4 inches it,all just screw past it but it won,t break it up. Large rocks or rubble can be a bit of a pain if they are too large for the auger to carry it out of the hole, one bloke operating the digger and the other stand by the hole and make sure your drilling straight and also remove any large stones.

Posted
I have one on a mini. It is a most excellant piece of kit and will speed up the job no end and take the sweat out of it,

With tree roots it does tend to do one of 3 things, break small roots up fine, deflect off the root and take the path of least resistance or it its a root of 3-4 inches it,all just screw past it but it won,t break it up. Large rocks or rubble can be a bit of a pain if they are too large for the auger to carry it out of the hole, one bloke operating the digger and the other stand by the hole and make sure your drilling straight and also remove any large stones.

 

 

 

:thumbup: sounds the way forward now to find a hire co that has one at a decent price. If it all goes reasonably smooth how many posts do you reckon can be done in a day?

Posted

Depends on your method of erecting ut to make use of the machine whilst its on hire if you line up and mark all the holes you,all fly along.

I did a job for a fencing contractor the other day to bore out 25meters worth of post and rail at 1.8meter centers. It was compacted shillet and I had unloaded the machine drilled all the holes and loaded the machine back up in less then an hour.

I reckon in those conditions it would have taken more like 5 hours to dig by hand.

Posted
Depends on your method of erecting ut to make use of the machine whilst its on hire if you line up and mark all the holes you,all fly along.

I did a job for a fencing contractor the other day to bore out 25meters worth of post and rail at 1.8meter centers. It was compacted shillet and I had unloaded the machine drilled all the holes and loaded the machine back up in less then an hour.

I reckon in those conditions it would have taken more like 5 hours to dig by hand.

 

At around £80 a day, its a no brainer really.:thumbup1:

Posted

Sounds the ideal way of doing it. I normally like to dig then set so I don't start to run off so if I hire it for a day and just work on till its done as reckon it would be a few days to dig them out by hand.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.