Jump to content

Log in or register to remove this advert

crane speed up!


Arbdog
 Share

Recommended Posts

Well be negative all you want!

 

Customer wants all timber logged up and is staying one sit.

 

I may have been wrong in my question in the first place, How justifiable is a crane financially and how fast does it speed the job up on average? (despite all trees are different ?)

 

Average take down time reduced by? as your not going to have a crane to take down a small tree!:001_huh:

 

I haven't not got a clue but I'll put my neck on the line and say you don't definately not want to even consi:001_tt2:der using a crane

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 20
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

That would be un-inexperienced!

 

that would be a double negative therefore he IS experienced:001_tt2:

 

Anyway in answer to the question I guess a crane would make the job quicker if your having to rig everything but as to how much quicker then that depends on many factors like is the crane operator a muppet? Is access for the crane easy? etc personally if the wood is all being left on site i wouldnt bother with the crane. In fact i never bother with a crane except if someone got one in for me already (i am freelance) so that makes me inexperienced. I think they are cool though in the right scenario.

Link to comment
Share on other sites

When a crane is used to full effect it is unbelievably quick.

 

I hardly ever use cranes now though as I cant justify the £500 a day cost, great if you have loads of work but pointless if the diary isnt filled.

 

 

They only get used now when there is no other cost effective option, or no other option.

Link to comment
Share on other sites

My thoughts exactly Barrington.

 

I think Peter made a very valid point about what is happening to the timber as well. If big lumps can be craned directly onto timber wagons or trailers, crane work can be very fast.

 

Then some other poor sod has to do the ringing up at the yard as a 'reward' for an early finish....:sneaky2::001_tt2:

Link to comment
Share on other sites

I'll use a crane if 1) The access is extremely poor 2) It really not cost effective to rig it down 3) Site conditions dictate (2ft drop zone) 4) my diary is stacked with work 5) I have 3 groundys on site. Large lumps on the deck can be processed quicker that way.

 

Speed yes its quicker compaired to rigging BUT only if the timber is leaving site in large lengths, other than that its not massivly quicker if there is room to rig it off.

 

Just my opionon tho.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.