what would you pay someone for day rate for forestry work


Stu
 Share

Recommended Posts

Try working it backwards from minimum wage:

 

9.5 x £5.93 = £56.33 +

 

3 litres fuel and 1.5 litres chain oil = £8

 

Wear and tear on saw, as well as sharpening costs = £5 a day (approx)

 

So, in order for you to make minimum wage, you need to be earning £70 a day. I don't think that decent cutters should be on minimum wage, so go for £80 instead.

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 42
  • Created
  • Last Reply

Top Posters In This Topic

If i was using my own saw, fuel, oil, sharpening,etc i would be needing at least £100 a day. Otherwise your better off just going and working as a groundie for someone. What happens if you need a new saw, where are you going to get the money for it?

Link to comment
Share on other sites

i work for £40 a day normally, forestry work with my own saw, ppe and other kit/tools, but im a student and i ent fussed really i just want the experience

 

This is the attitude you want mate, don't get me wrong that's no alot of money your getting... but just think of the valuable experience you will gain:thumbup:. say after a few month's ask your boss for a pay increase. Everyone earns crap money at the start mate. Regards Western

Link to comment
Share on other sites

Try working it backwards from minimum wage:

 

9.5 x £5.93 = £56.33 +

 

3 litres fuel and 1.5 litres chain oil = £8

 

Wear and tear on saw, as well as sharpening costs = £5 a day (approx)

 

So, in order for you to make minimum wage, you need to be earning £70 a day. I don't think that decent cutters should be on minimum wage, so go for £80 instead.

 

agreed but he is possibly not a decent cutter

and if this is his first job i would doubt he was a while till he was producing enough to earn his keep

Many a guy would do this for expenses just for the experience that there are a lot of guys would love

 

Stu this was not meant as a critisem of you as obviously dont know you but a generalisation

Link to comment
Share on other sites

yeah working in forestry is a great experiance!! and well worth not earning great money because of that but i was jus trying to get a rough idea, even though its a great job to work in!! ive still gotta earn a wage cause thats what i go to work for, i jus thought £50 wasnt alot for a very hard and long day even if im not the most experianced

Link to comment
Share on other sites

Hi, by the sounds of it you are self-employed?? You mention the contractor, are you a sub-contractor and self-employed? If so you are not entitled to minimum wage! Being self-employed you state your rates and terms or accept the rate you are offered and the terms offered - provide fuel, oil, ppe etc. If you are not happy with it then you negotiate or turn the work down and look elsewhere.

 

Who is not entitled to the National Minimum Wage : Directgov - Employment

 

So, assuming you are self-employed...If you were cutting less than 4 tonnes a day and requiring constant supervision, help and instruction then I would say that's fair but only if you are provided with at least fuel and oil. By the sounds of it you are beyond that so try and understand how the contractor is paid. If it is tonnes then suggest being paid a fair tonnage rate given your experience.

 

If, however, you are an employee (or have not been given anything stating you are self-employed or employed for that matter and it is 'assumed' you are an employee) then the minimum wage kicks in. Be careful here as you may end up on an apprentice wage which I think is only £2.50/hr. The fuel, oil, saw, PPE, consumables etc - you have a strong argument that your employer should provide them, it could be law but a lawyer I am not!

 

As an employee you cannot be forced to work more than 48hr a wk on average. Working time limits (the 48-hour week) : Directgov - Employment

 

I hope that helps.

Link to comment
Share on other sites

Na im not gunna say anything yet, i wanna get a bit more experiance first then il talk to him

 

i just wanted to get a rough idea of what was right and whats not.

 

and im back on piece rate now started a new site:001_smile:

 

hi ian yh im self employed. what do you think a day rate should be? i work by myself without no supervision all day and have done so since ive been with the company when i first started i was probaly cutting 4 tons or less but now i try to do at least 7 but aim for 8 or 9and more and have just over 2 months experience?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.