6 minutes ago, difflock said:

Now now, that square mile may well choose to be as many acres as it likes.

I was highlighting that it's not the actual size of the installation, it'll just be the purchase of the farm/estate under a CPO.

 

Hinkley Point A at 500MW had a transformer area of only 2 acres outside the main gates.

Edited by GarethM
  • Like 1
Link to comment
Share on other sites

Log in or register to remove this advert

likewise suspect that is the total areas and not the built area - will include landscaping, land set aside, trees and so on. Construction areas will of course be removed and not built on for the project though there will be cabins and temporary parking for a year or so

Link to comment
Share on other sites

11 hours ago, Johnsond said:

The wind farms are all along the east coast 

moray east, moray west, sea green etc etc a licence to print money. Sadly the politicians in particular the green idiots in Scotland have given this environmental disaster the green light up here. 

I was referring specifically to the import of power from Shetland and the mainland infrastructure construction; I think that's a separate project.  I can't speak for Beatrice 1, 2 etc

Link to comment
Share on other sites

Since it was the last one mentioned, I have run Loch Buidhe through the software this morning and it looks like the substation is about 125620m2 including a couple of access roads and a diverted track... or 30 acres (12 hectares). From the satellite images the forest area recently cleared around it is 250 acres (101 hectares) - certainly not all going to be built on.

 

Substation compound is about 325m by 230m. A lot smaller than the figures quoted above.

Link to comment
Share on other sites

5 minutes ago, Steven P said:

Since it was the last one mentioned, I have run Loch Buidhe through the software this morning and it looks like the substation is about 125620m2 including a couple of access roads and a diverted track... or 30 acres (12 hectares). From the satellite images the forest area recently cleared around it is 250 acres (101 hectares) - certainly not all going to be built on.

 

Substation compound is about 325m by 230m. A lot smaller than the figures quoted above.

Coachford site details see below, that's what is planned at the moment. wait for the battery storage and Hydrogen plant to add in. The dimensions below do not include the platform towers of which there are 4 at 50m by 50m. Post 2030, the undersea line from Shetland to come into the site and another line of Pylons to take power out.

 

What size is the site?
The approximate size of the application site
(contained within the redline boundary) is 84ha,
whilst the dimensions of the proposed substation
platform are approximately 551m x 320m, not including
the groundworks required to make a level platform.
The layout of the substation has been developed as
an Air Insulated Switchgear (AIS) substation which will
consist of AIS equipment located outdoors, including
busbars, switchgear and synchronous compensators,
which are used to marshal and control electricity supply.
Indicative landscape strategy plan
10

Link to comment
Share on other sites

3 hours ago, Steven P said:

... and a little more context... Blackhillock 'the UKS largest substation' up near Kieth is not a lot bigger than the quarry next door.....

Would you want to live near either, when you have no say in the matter, SSEN are only doing a smoke and mirrors exercise. There is no need for the infrastructure when it is mostly a get rich scheme for foreign investors and for export to the EU.

  • Like 2
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.