Jump to content

Log in or register to remove this advert

Lake management...


Ty Korrigan
 Share

Recommended Posts

I've a old and regular client with a 27 hectare lake on the Brittany-Normandy border.

It has been drained to prevent the dam collapsing due to a leak.

Meanwhile, as the 'County Council' plus 2 local village councils and insurers lawyers wrangle over who pays, the weeds are a growing and nothing grows faster in rich century old lake silt than poplar and goat willow.

The lake never seems to dry out fully and is criss crossed by small streams.

The crust forms hexagonal plates which move like unstuck tiles.

We tried clearing an area with a Grillo 2 wheel tractor and scissor bar mower attachment.

Cumbersome and bogs down easily plus gets caught up what it has cut when reversing.

Also we cannot cross the streams which also run underground leaving a area of marsh.

I am inclined to go at it with a team equiped with clearing saws.

Another issue is what to do with the brush once cut? 

We cannot burn it and it will form mats which will block the sluice once the lake is re-filled which requires a diver to clear.

I tried to take a '360' series of images.

Any advice welcome.

Cheers

  Ty

 

 

20170917_122021.jpg

20170917_122009.jpg

20170917_122012.jpg

20170917_122016.jpg

20170917_122018.jpg

Link to comment
Share on other sites

Log in or register to remove this advert

Why would you need a diver? The water runs over the top of the sluice.

 

Anyway this dam was compromised and we had to clear a load of trees on the left, (empty lake on the right) before a 360 repaired it.

 

The client tried clearing the vegetation, then gave up and left it. It must have died off and disappeared unable to survive submerged.

IMG_0406.JPG

Link to comment
Share on other sites

30 minutes ago, Mick Dempsey said:

What about doing nothing? Assuming it'll get filled before spring.

 

 

27 hectare? You sure?

Can't fill it until dam is repaired.

It's subject to an 'Arret Prefectorial'

Weight limit over dam reduced to 3.5t which the farmers ignore.

It's been empty 4 years now. 27 hectares includes the marshland surrounding which is the breeding ground for the fish so I am told.

The whole property is worth 500k once the dam is fixed and lake re-stocked.

 Ty

 

Edited by Ty Korrigan
Link to comment
Share on other sites

If it was my lake I'd probably be getting an excavator in to de silt the entire lake. 

 

If you just want the vegetation removed why not fence it and put goats in?

 

I'd also be building a new outlet. Having a diver clear a sluice gate of vegetation has "corporate homicide" written all over it.

  • Haha 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.