Jump to content

Log in or register to remove this advert

Big J

Veteran Member
  • Posts

    9,232
  • Joined

  • Last visited

  • Days Won

    46

Everything posted by Big J

  1. What was your plan for the milling? I would be quite keen on the stem if you were willing to part with it.
  2. I've done this a few times myself. Even logs nudging 1.5 tonnes aren't tricky if you get the rope right. Matty, if you feel so inclined, bring the maple up to me and I'll mill it. I'll put in on the pile with all the rest of Steve's timber!
  3. Just waiting for Steve (seventhdevil) to get all excited. ... Nice stem there. It's worth more than £50 and I would not mill it with a chainsaw mill. It's small enough for the wastage percentage to be too high. I'll be passing late March/early April if you would like to sell it on.
  4. I just use diesel. It works well, I use next to nothing and I have red in the yard for the machines anyway.
  5. Right, sorted the haulage. 65 or 70 cubic metre loads, from an artic tipper, anywhere within 100 miles of EH52 for £32 a cubic metre.
  6. Chain oil doesn't get burnt either though. You'd easily use 5 litres in a day's milling whereas 5 litres of red lasts me weeks.
  7. No trace of the dye and in terms of environmental impact, I probably produce 50 cubic metres of Sawdust for 10 litres of diesel used, which is much better than a chainsaw mill.
  8. Use diesel as the blade lubricant rather than water. Water is messy, doesn't lubricate well and reacting with the steel of the blade stains the wood. Also, you use very, very little diesel by comparison - get weeks and weeks of cutting out of about 5 litres of red.
  9. <p>Hi Jeremy - sounds bloody heavy! I'll post some photos on Saturday, or if you can PM me your phone number over, I'll text them to you. J</p>

  10. Lovely shed there Adam! It is a lot of machine for the money. I'm just about to put an order in for the frame saw and the edger.
  11. Not having sifted through the entire thread, all I'd really like to see added is a much, much larger PM inbox. Given that most PMs are just text, the storage requirements are very small. Having only 100 is very limiting.
  12. I have oak up to 3m in the yard and loads of exceptional quality larch up to 8m - it's boatskin grade really. We are 108 miles away, just west of Edinburgh.
  13. <p>No. I don't dry burr any more - no need. It always sells green. Sorry!</p>

  14. Don't think so on the English front. Just for reference, my friend will be importing the WEB series of Unsinn trailers shortly. We're keeping it simple and not doing customised trailers at this time. I've had the WEB28 since May, put about 12000 miles onto it and it's been fantastic. Great trailer.
  15. Much appreciated Stu, and spoke to Ian this morning. No luck though. Still on the hunt!
  16. I hope you mean report - to repot all those trees will take a while!
  17. Stressed to a point. Always stressed to a point, but more so in preparation for a large elm felling job. The prospect of 3-4 weeks on site, a £20k contractor bill and no certainty out income is indeed stressful. Not looking to do too much more of this and have a less stressful line of work developing. Less time away from the family too. My difficulty is that I always over extend myself, buying kit that I know will be very useful and will earn me money, but it does take it's toll. Would really like to get to the point of having a couple of months turnover sat in the bank as a buffer. I'm certain I'd sleep much more soundly.
  18. Bumpety bump. In need of some more - have plenty coming my way in May, but need about 50 tonnes (or more) just now. Half of it needs to be minimum about 450mm top end - length is unimportant.
  19. Hard to get an idea of scale - what diameter is that log?
  20. Lovely morning here. Clear, minus 2 and optimistic for a day without rain. Nearly managed it yesterday but for a shower in the afternoon. If we are dry today, it will end 31 days of continuous rainfall.
  21. All 23 or 25mm stock. No variation and batches done by the lorry load. Right, mind made up, I'll order one. Just need to fund the bloody thing now!
  22. Reasonable demand. It's behind elm and oak, but is probably third in popularity.
  23. Won't be me operating it - I'll be on the mill. Cants can be mechanically conveyed straight from sawmill to the frame saw (hydraulically powered rollers on the sawmill are handy) and can be cut whilst the next log is getting dimensioned on the sawmill.
  24. Much higher power requirement for circular saws and I wouldn't be able to keep up with a faster speed rate anyway. Surely one lorry load a day is enough!?

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.