Jump to content

Log in or register to remove this advert

Retraining - Chimney Lining


Catweazle
 Share

Recommended Posts

Log in or register to remove this advert

I use to get a weight on a rope lower it down then fit a big sponge on and pull it up until it starts sealing the chimney and tip sand and cement mix down and slowly pull the sponge up, therefore sealing said pipe. Oviously with no ali tubing inside, then light a smoke bomb in fire place to see if it draws air up properly.

Link to comment
Share on other sites

don't now if you need qualification to fit the liner but you need to be hetas engineer to connect the stove and sign it off for building regs !

 

True, but installing these linings is not a one man job. A couple of guys could install linings and leave connection and draw / safety testing to the HETAS fella.

Link to comment
Share on other sites

True, but installing these linings is not a one man job. A couple of guys could install linings and leave connection and draw / safety testing to the HETAS fella.

i think its a good idea anyway ! after all you did say retraining ,personally i would get hetas approved and do the job lot ,that way you can offer the whole package .

Link to comment
Share on other sites

i think its a good idea anyway ! after all you did say retraining ,personally i would get hetas approved and do the job lot ,that way you can offer the whole package .

 

You do need a second body to pull the liner through from the other end. Some bricky skills are sometimes necessary too, as the job can entail removing/replacing bits of the stack to steer the liner around problems.

Link to comment
Share on other sites

I fabricated a short tapered cone that clamped to the liner and had an eyelet at the point,dropped the lead rope down from the top and had it pulled from below whilst I fed it in from above,done this twice and it flew down the chimney with no problems - having said that you still need the brickie skills to make the brickwork good around the register plate and the opening !

Link to comment
Share on other sites

I fabricated a short tapered cone that clamped to the liner and had an eyelet at the point,dropped the lead rope down from the top and had it pulled from below whilst I fed it in from above,done this twice and it flew down the chimney with no problems - having said that you still need the brickie skills to make the brickwork good around the register plate and the opening !

 

Good idea with the cone!:thumbup:

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.