Jump to content

Log in or register to remove this advert

Recommended Posts

Posted
Calm yourselves, it wont be until weekend as by the time i get home from work, play with little en, have a shower, eat me tea its proper dark.

 

Fair enough - we'll just have to amuse ourselves till then.

Bloody jobs eh - always getting in the way of the good stuff :lol:

Log in or register to remove this advert

Posted
My biggest machine is my panel saw which has a 5kw 3 phase motor and I run a 3/4 kw dust extractor and a few lights at the same time . Probably max at any one time of 6kw

 

Thats ok the system I am looking at is 5 kwe with peak 10 kwe or multiples of that. Prices are still being sorted so will let you know when I know

Posted
You said this 12 months since, is it getting any nearer???

 

Hi Skyhuck

It is most definitely NOT 12 months ago that I posted that, more like 3 or 4, but you know what its like, these things always take a bit longer than you want or think. I am hoping to get the designs within 2 weeks so should be able to give more info in the near future. The trials are giving better results than we had ever hoped for so it will be coming.

I have already placed my order for the first one.

Woodworm

Posted
Hi Skyhuck

It is most definitely NOT 12 months ago that I posted that, more like 3 or 4, but you know what its like, these things always take a bit longer than you want or think. I am hoping to get the designs within 2 weeks so should be able to give more info in the near future. The trials are giving better results than we had ever hoped for so it will be coming.

I have already placed my order for the first one.

Woodworm

 

Apologies, I've just looked and it was 6 months ago that you said it, and in fact at that time you said it would be out in 12 months not 6, so your actually still on track, sorry :blushing:

 

Sounds really good, I would love one!!!:thumbup1:

Posted
Is it to fit into the government micro chp scheme if so it will only be 1kwe.

 

I am under the impression that microgeneration is up to 50kWe, but am happy to be corrected.

Posted
Apologies, I've just looked and it was 6 months ago that you said it, and in fact at that time you said it would be out in 12 months not 6, so your actually still on track, sorry :blushing:

 

Sounds really good, I would love one!!!:thumbup1:

 

Its going to be good I can promise you!

Will keep you posted

Posted
Within 6 months there will be a new design of biomass pellet boiler doing exactly the same thing as that. Producing heat and electric. Designs for the units are almost done and once they are, production begins.

It will be announced on here as soon as they are available.

A good friend of mine told me exactly the same thing 5 years ago.

  • 4 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.