Jump to content

Log in or register to remove this advert

old landrover cherrypicker


64treefrog
 Share

Recommended Posts

Thanks Little Steven, very usefull.

Treequip, The rules regarding MOT and red are confusing but I have had long phone conversations with DVLA and Customs and excise....

If the cherry picker comes in at over 3500kg then is Special Vehicle and doesnt require an MOT, as landy is under that weight I would have to supply all details to them and they will grant special rules (subject to being assesed by commitee). The item of equipment has to be perminantly mounted and relies on the base vehicle to be opperated. Pretty much the same with the red, as the picker is powered by the landy engine it can be run on red. It can only be used for purpose!

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 22
  • Created
  • Last Reply

Top Posters In This Topic

Would help if I added it whoops

CALM/HIAB

 

• CHECK CERTIFICATE FOR ANY OUTSTANDING REPAIRS

• POSITION IN SUITABLE TEST AREA (AS PER LOCAL INSTRUCTIONS)

• CHECK GENERAL CONDITION OF TRUCK (TYRES HYD LEAKS ETC)

• REMOVE LOCKING CONTROL LOCKING PIN

• ENGAGE PTO AND UP REVs TO 1000rpm

• DEPLOY STABLIZERS – FULLY EXTEND THEN RETRACT UNTIL WEIGHT ON TYRES BUT NO SIDEWALL DEFLECTION (ENSURE HYD TAPS CLOSED ONCE SET)

• RAISE BOOM

• SLEW OVER BED AND FULLY EXTEND AND UNFOLD

• THOROUGHLY INSPECT CRANE AND MOUNTINGS

• CHECK SLEW BEARING PLAY

• UNSTOW HOOK AND INSPECT

• CONFIRM ALL FUNCTION OPERATE AS LABELLED

• CYCLE CRANE THROUGH ALL MOTIONS – WARMING OIL TEMP

• ATTACH KNOWN WEIGHT TO HOOK POSITION LOAD OVER STABILIZER

• MARK STABILIZER AND AVAILABLE RAMS AND CHECK FOR CREEP (10mins)

• POSITION LOAD OVER BED AS PER LOAD CHART EXTEND UNTIL MOTION STOPS- MEASURE RADIUS FROM CENTRE OF ROTATION AND COMPARE TO LOAD CHART

• CHECK REMAINING STABILIZER FOR CREEP (10mins)

• ALLMI ALSO STATE THAT A DYNAMIC TEST SHOULD BE COMPLETED... THIS IS BASICALLY OPERATING THE CRANE WITH 110% LOAD ON HOOK HARSHLY... BEING HEAVY HANDED WITH CONTROLS – STABILIZERS MAY LOOSE CONTACT WITH GROUND DURING THIS TEST

• REMOVE LOAD AND RE-INSPECT CRANE

• PACK AWAY

• COMPLETE PAPERWORK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PLT (STATIC) IF HAPPY CRANE IS WORKING WITHIN LIMITS

 

• AFTER CONDUCTING SWL FULLY EXTEND JIB(HORIZONTAL AS PER LOAD CHART) & POSITION CRANE TO EXTREME OF SLEW IN ONE DIRECTION

• ATTACH LOAD WHICH IS 125% OF RATED CAPACITY WITH FORK LIFT

• SLOWLY LOWER FORKLIFT

SAFETY MAN REQUIRED TO WATCH VEHICLE GROUND CONTACT POINTS

 

• ONCE LOAD SUSPENDED SLOWLY SLEW (SAFETY MAN TO CONTROL SLEW-IF VEHICLE BECOMES UNSTABLE LOWER WEIGHT)

• NO LIFT FUNCTION TO BE OPERATED WHEN SLEWING ONCE AT OTHER EXTREME LOWER LOAD

• THOROUGHLY EXAMINE CRANE AND MOUNTINGS FOR ANY SIGNS OF STRESS/FATIGUE

• PACK AWAY

• COMPLETE PAPERWORK

CALM/HIAB

 

 

 

 

Sent using Arbtalk Mobile App

Link to comment
Share on other sites

Would help if I added it whoops

CALM/HIAB

 

• CHECK CERTIFICATE FOR ANY OUTSTANDING REPAIRS

• POSITION IN SUITABLE TEST AREA (AS PER LOCAL INSTRUCTIONS)

• CHECK GENERAL CONDITION OF TRUCK (TYRES HYD LEAKS ETC)

• REMOVE LOCKING CONTROL LOCKING PIN

• ENGAGE PTO AND UP REVs TO 1000rpm

• DEPLOY STABLIZERS – FULLY EXTEND THEN RETRACT UNTIL WEIGHT ON TYRES BUT NO SIDEWALL DEFLECTION (ENSURE HYD TAPS CLOSED ONCE SET)

• RAISE BOOM

• SLEW OVER BED AND FULLY EXTEND AND UNFOLD

• THOROUGHLY INSPECT CRANE AND MOUNTINGS

• CHECK SLEW BEARING PLAY

• UNSTOW HOOK AND INSPECT

• CONFIRM ALL FUNCTION OPERATE AS LABELLED

• CYCLE CRANE THROUGH ALL MOTIONS – WARMING OIL TEMP

• ATTACH KNOWN WEIGHT TO HOOK POSITION LOAD OVER STABILIZER

• MARK STABILIZER AND AVAILABLE RAMS AND CHECK FOR CREEP (10mins)

• POSITION LOAD OVER BED AS PER LOAD CHART EXTEND UNTIL MOTION STOPS- MEASURE RADIUS FROM CENTRE OF ROTATION AND COMPARE TO LOAD CHART

• CHECK REMAINING STABILIZER FOR CREEP (10mins)

• ALLMI ALSO STATE THAT A DYNAMIC TEST SHOULD BE COMPLETED... THIS IS BASICALLY OPERATING THE CRANE WITH 110% LOAD ON HOOK HARSHLY... BEING HEAVY HANDED WITH CONTROLS – STABILIZERS MAY LOOSE CONTACT WITH GROUND DURING THIS TEST

• REMOVE LOAD AND RE-INSPECT CRANE

• PACK AWAY

• COMPLETE PAPERWORK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PLT (STATIC) IF HAPPY CRANE IS WORKING WITHIN LIMITS

 

• AFTER CONDUCTING SWL FULLY EXTEND JIB(HORIZONTAL AS PER LOAD CHART) & POSITION CRANE TO EXTREME OF SLEW IN ONE DIRECTION

• ATTACH LOAD WHICH IS 125% OF RATED CAPACITY WITH FORK LIFT

• SLOWLY LOWER FORKLIFT

SAFETY MAN REQUIRED TO WATCH VEHICLE GROUND CONTACT POINTS

 

• ONCE LOAD SUSPENDED SLOWLY SLEW (SAFETY MAN TO CONTROL SLEW-IF VEHICLE BECOMES UNSTABLE LOWER WEIGHT)

• NO LIFT FUNCTION TO BE OPERATED WHEN SLEWING ONCE AT OTHER EXTREME LOWER LOAD

• THOROUGHLY EXAMINE CRANE AND MOUNTINGS FOR ANY SIGNS OF STRESS/FATIGUE

• PACK AWAY

• COMPLETE PAPERWORK

CALM/HIAB

 

 

 

Sent using Arbtalk Mobile App

 

That's for a mobile crane, the protocols fro a mewp are different, most mewps aren't designed for "lifting" anything other than what's in the basket.

 

The ALLMI training for mewps specifically prohibits using it as a crane

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.