Jump to content

Log in or register to remove this advert

Recommended Posts

Posted

Well we have finally finished milling the Oak tree I have been discussing here, the milling went fine (3 chains now blunt and waiting for us to sharpen them), but moving what we had cut! All I can say is wet oak is bloody heavy!

Log in or register to remove this advert

Posted

Here goes! Here is some of the Oak we have been milling - the first picture shows the 3" plank ready to be lifted off the remaining stump and the second one of 4 piles of planks before they have been sticked.

IMG_0656.jpg.f600d0daaf3aafbc6c2a968ad9382fae.jpg

IMG_0651.jpg.e391a4510b884c8596d8899e3b1f7214.jpg

Posted
i'm finding making sure the ladder doesn't twist when you fix it to the trunk is critical and takes practice to get it level!:thumbup:

 

Agreed a good eye helps! But what we have found it that we take a load of various wedges and use these to stop the ladder bending into the trunk, also we use a load of 'feather edge' cut offs to push into the cut as we progress down the log - seems to work for us. :thumbup:

Posted

I have just purchased a few more plastic wedges to help get ladder level and to put in the cut during further slabbing, I made some wooden ones but they didn't seem to stay in so well as the plastic with it 'grippy' bits on!

 

Practice at milling will help learn the tricks i can see!:biggrin:

Posted

Look like nice boards - I've moved a few 3" slabs and you certainly feel it!

 

Another trick for levelling. Carry a few coach screws in various lengths. If you're using an old Stihl then use M10 (17mm heads), new Stihl use M12 (19mm heads). That way they match your bar nuts so the same wrench will fit. They're good for sticking round the curve a bit - either directly under the rail or to support a thin board resting on the screw and the crown of the curve of the log, or straight across to screws on the other side of the log. They're infinitely adjustable, and don't fall off - just don't forget them when setting the depth of cut! You can always make the first cut deeper by the depth of your first plank, then flip the section over and mill the plank off from the cut face.

 

Alec

Posted

Well here is some of our Oak almost fully sticked! run out of the little blighters, need to cut some more, quite a pile - there are three more (not stacked so high).

5976609db9c5c_StackedOak.jpg.3933d135ed06f16c8f1570286a0bb68c.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.