Jump to content

Log in or register to remove this advert

Trailer chip box


charlie batten
 Share

Recommended Posts

Hi, I recently got myself a 126T IforWilliams tipper and im wanting to build a removable chip box. Has anyone done this? if so some info and pics would be really useful. We've used it a coule of times already to chip into but just stood some old boards up but it looks a bit rough. Some pics for ya....

 

IMG_0775.jpg

IMG_0788.jpg

IMG_0789.jpg

Link to comment
Share on other sites

Log in or register to remove this advert

I do the same; 8'x5' tipper = 5'x4' headboard (cut from 8'x4' sheet ply) and two side g.boards 4'x8'. Two slots in the front of the side boards near the top and a ratchet strap holds it all together around the lader rack which yours has. Once the ply looks manky I bin it and buy another set; typically once a year so £60ish a year. :biggrin:

Link to comment
Share on other sites

if you can, get the mesh sides made by ifor, then bolt some ply to them to stop chip going through, easily removable piece by piece then, i have a 12ft ifor which i have mesh sides on and a high back ramp, it will fit loads of chip or logs or anything in, plus if access is tricky you can remove a panel, chip against any other panel, then when you need to move, put the panel back on. nice and simple

Link to comment
Share on other sites

I built mesh sides for my 8x5 trailer a few weeks ago

 

It's inch weldmesh, you could cable tie tarpaulin or black plastic dpm to the inside for a light way of holding chip?

 

 

 

 

 

P1010177x.jpg

 

 

 

(halfway through painting)

 

P2140022x.jpg

Link to comment
Share on other sites

if you can, get the mesh sides made by ifor, then bolt some ply to them to stop chip going through, easily removable piece by piece then, i have a 12ft ifor which i have mesh sides on and a high back ramp, it will fit loads of chip or logs or anything in, plus if access is tricky you can remove a panel, chip against any other panel, then when you need to move, put the panel back on. nice and simple

 

We have a 14 x 6 ft twin axle with the caged sides. We do the exact same as you. We put a mark on the plywood to tell us when the trailer is at the vehicles max towing weight. Only had it overloaded once then decided to have 2.7 ton of chippings loaded in and level then routed a line into the 12mm marine ply. Its held in by cable ties so its nice and easy to remove. But certainly makes it feel like your dragging a parachute behind you and in a crosswind it has almost caught us out.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.