Jump to content

Log in or register to remove this advert

Crap Drystone walling


Dean Lofthouse
 Share

Recommended Posts

  • 3 weeks later...

Log in or register to remove this advert

  • Replies 54
  • Created
  • Last Reply

Top Posters In This Topic

I have a couple of pics of what i have been doing for thelast few months- only a day or two or three a week in between tree stuff. We have finished, but are going back on monday to get pics and clean the dust off and measure, and i will ge more an better pics in a new thread.

001.jpg.4a54232b0bc33a5b4f4e77f7c94098e6.jpg

 

002.jpg.8ab96846a43d721113d851bca6a99df6.jpg

 

004.jpg.5847860e9960c5ecc192b673fe1a84d8.jpg

 

005.jpg.13fd58a07f9e48420ac9f11bd5c49b50.jpg

 

We have also done the outside of the curve. More to follow, but i thought they would be right at home in a crap walling thread lol.

Link to comment
Share on other sites

I have a couple of pics of what i have been doing for thelast few months- only a day or two or three a week in between tree stuff. We have finished, but are going back on monday to get pics and clean the dust off and measure, and i will ge more an better pics in a new thread.

[ATTACH]41073[/ATTACH]

 

[ATTACH]41074[/ATTACH]

 

[ATTACH]41075[/ATTACH]

 

[ATTACH]41076[/ATTACH]

 

We have also done the outside of the curve. More to follow, but i thought they would be right at home in a crap walling thread lol.

 

& how much a mtr does that very nice & fancy walling cost :scared1:

Edited by Johny Walker
Link to comment
Share on other sites

£175 + VAT plus the stone, which is about 180 vat a metre. Our bill came to around 28k plus vat.....out of 1.9 million build cost....

 

Edit- we started off at 200/ metre, but the building company we were subbying to (who are good friends) couldnt make anything, so we knocked it down for them.....they quoted 80 a metre lol.

Link to comment
Share on other sites

Cheer mate. I havent really done any for about 3 years- i did it almost solid for about 3 ubtil about 2007. We (2 of us) barely managed to build 2 square metres a day, we are fairly particular...The joints are no thicker than a roof slate, and there are quite alot of slates that were split thiner to make packers!!!

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.