Jump to content

Log in or register to remove this advert

AA Teccie (Paul)

Veteran Member
  • Posts

    3,533
  • Joined

  • Last visited

Everything posted by AA Teccie (Paul)

  1. This post cannot be displayed because it is in a password protected forum. Enter Password
  2. Hi all, don't forget the other important aspect of HAVS management is 'health surveillance' using the initial and annual screening questionnaires on the HSE website and referring on to the Occupational Health Specialist (OHS) if problems are suspected. See Hand arm vibration - Health surveillance The HSE put a great deal of emphasis on HS and it is an employer duty to do it. Cheers.. Paul
  3. Hello Gareth, the old tree logo was the basis for the new one but I'm not sure its identical (that said it was our web-man who produced it, with direction n input from the committees etc., n also the same person who did the 50th logo too.) "Interesting" is hopefully good.. cheers.. Paul
  4. Hi all. Just to clarify, the "sneak preview" above is the replacement generic logo, i.e. replacing the 'Cares for Trees' logo used by the Association itself. The accreditation schemes, AA Registered Consultant and ARB Approved Contractor, will have something quite different...to be released to them in the next few days. Regards all.. Paul PS...I quite like it too
  5. Hi Will, We do have further workshops running later in the year, i.e. Autumn, at both Bicton College (Exeter) and Sparsholt College (Winchester) so "watch this space." Sorry we're not in your area any sooner but hope to catchup later next year...unless you fancy a little jaunt beforehand of course Cheers.. Paul
  6. Hi all, So, first FREE workshop of the year is at Myerscough College, just north of Preston, on Weds. 20th Jan. See ARB Approved Contractor Preparation Workshop for further information and booking. Hoping to see you there.. Paul
  7. ...well, okay, maybe a tad over-exaggerated but still, well worth a look at for 2016. So, why not come along to a FREE workshop about the ARB Approved Contractor Scheme if only to find out more n see what's involved in demonstrating a compliant business. See Training - Arboricultural Association for date n venues but I will post these separately. Go on, you know you want to..! Cheers all.. Paul
  8. Not surprisingly, my contribution includes AFAG 401: Ladders Check ladders for defects before use (refer to the manufacturer’s instructions). See ‘Further reading’ for more advice. Ladders are normally only used as a means of access into the crown of the tree. Once the climber is secured to the tree by rope/lanyard and harness, the ladder should be removed. Position the base of the ladder at a distance approximately one-quarter the height of the ladder, away from a vertical line dropped from the point of contact with the tree. The unsupported part of the ladder must not touch any obstructions, even when loaded with the climber’s weight. Incorporate a non-slip or stabilising base on the ladder and secure the ladder appropriately, either by attaching a rope from the tree to the ladder base or by having a member of the ground staff foot the ladder. Where possible, pre-install a climbing line to safeguard the ladder ascent. If this is not possible, the climber needs to be secured to the tree before leaving the top of the ladder, or carrying out any other work. AND the industry ICOP: 2.8.2 Ladder The use of ladders or steps must be restricted to low risk, short duration tasks, such as accessing the lower portion of the tree canopy in order to begin a staged ascent or limited duration access for hedge trimming. If ladders are to be used for tasks which require the user to be ‘hands free’, the operative should ensure they are also correctly anchored into the tree structure. If the task requires working from a ladder for extended periods of time, another work method must be considered.
  9. Saw something very similar in a woodland in Burnley just recently whilst delivering a Tree Inspection course, riddled with Kretzschmaria / Ustulina too...maybe worth a closer look. Cheers.. Paul
  10. Hi Ian, hope yer well. Is it an emergent Ganoderma' appen? Cheers, Paul PS the attached may be "of interest" ARBACApplicationForm-V3.docx
  11. Not doubting the above advice / information, which contradicts mine , but guidance on the planning portal make no reference to "reserved matters", only differentiating between FULL and OUTLINE planning permission. Hence I would be cautious about proceeding with tree removals as reserved matters and recommend prior confirmation of such from the LPA / TO. Cheers.. Paul Now a 'shrinking violet'...well okay, a weed.
  12. Pretty sure, even with agreed reserve matters, outline planning does not override the TPO still, i.e. in the 2012 Regs. Paul
  13. You'll find their contact details here: Directory of Arboricultural Association Registered Consultants Cheers..
  14. Hi Betula, can I suggest in canvassing views, always very useful, you also make contact with a few AARCs and seek theirs too. Cheers.. Paul PS Along with my main role in managing the ARB Approved Contractor Scheme I am also part of the AA team managing the RC Scheme.
  15. Thank you Jay, your post here is much appreciated and it's very pleasing to hear the ArbAC status is working so well for you / the business. Obviously there is still much work to do but its good to hear we are at least getting some things right. Thanks again.. Paul PS the other important thing here is what the business does with the accreditation and the way it promotes itself on the back of it...well done!
  16. Sorry, not sure the message above posted
  17. Hi, I understand cost is an issue, particularly for a start-up business, but I do believe the scheme offers value for money. Try to get to a workshop and I can explain more and in detail. The £495, +VAT unfortunately, is an initial assessment fee payable every 5th year but with an interim assessment fee of £450 +VAT in year 3. The additional CHAS fee is an annual licence fee, plus admin, which is payable whoever you use. Sorry not much detail here but struggling tapping a smart phone screen. Cheers.. Paul
  18. Why not consider looking into your (only real) 'industry specific' accreditation, i.e. ARB Approved Contractor (see Become an ARB Approved Contractor ) and support the cause in terms of greater industry representation and recognition. We run one-day workshops, FREE, and you can both find out more about ArbAC AND ask me about the other accreditation opportunities (see Training - Arboricultural Association ) Because of SSiP membership, ArbAC is deemed an equivalent safety scheme to all the others. SORRY all, if you reply here I'm up in Scotland for a few days so may not be able to respond immediately. Cheers.. Paul PS Forgive me, I'm sure all are aware but this is a business accreditation opportunity not an individuals, albeit many individuals cite their reasons for becoming approved as a personal goal.
  19. "Pendula, pendula.." (arboricultural speak for "bravo, bravo") Cheers Betula, good, very pertinent / astute, post Paul
  20. Hi Steve, a 'launch' date hasn't yet been determined but it will be soon. Paul PS Just to confirm it hasn't yet appeared on the site
  21. hahaha, yeah, probably better to get approved first Gary cheers, n hope yer well. Paul
  22. Hi there, I understand your frustrations here but its the first change in probably 30 years, or more, n long overdue some would say to both update n refresh the logo. Members who are on the AA various committees, including 'Media and Communications,' which is open to all did have an input, or at least the opportunity to do so. Once finalised, there will be a reasonable time period / lapse to phase in use of the new logo n appreciate there's never a good time to do something like this but we wanted to give people the 'heads up' in case they had it in mind to do some changes in the near future. Sorry again but at least you've got the opportunity to start planning the phase in perhaps Cheers.. Paul
  23. So, what did I do wrong?
  24. As others have said you have 2 years to implement the consent. I would strongly advise liaison with the LPA here and keep them informed. Cheers.. Paul
  25. Whilst this seems understandably logical, i.e. phased removal, apparently there is no research to back it up. Remember also, in general terms, heave only occurs where trees significantly pre-date buildings and hence they've been constructed on desiccated soils without the appropriate engineering controls being used. Cheers.. Paul

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.