Jump to content

Log in or register to remove this advert

Arb Method Statement...


benedmonds
 Share

Recommended Posts

I had to do a AIA at a site, while there I was asked to write a Method Statement at a neighboring part of the site for construction of a patio. The trees are TPO'd....? There's been a big fire under one, two have had about a foot of soil removed to within 3ft of the trunk..

 

Where do you start...

Turn back the clock 6 months, install tree protection fencing

59765b8e5f6fd_23102008294.jpg.da5226c1346665ce7252744fd803ef5b.jpg

59765b8e5b9a3_23102008293.jpg.8fb6dd96a4f0dc40c35b5a2bb54585f5.jpg

Link to comment
Share on other sites

Log in or register to remove this advert

The method statement should be done by the company doing the patio work.

 

You may need to do a risk assessment in regards to the trees which is a completely different thing.

 

I would clarify what they want from you tbh.

 

Unless it's you involved with the the construction side.

 

Or I could be mistaken:001_smile:

Link to comment
Share on other sites

I would make sure that some form of protective fencing is erected ASAP until the patio is ready to be constructed. Clear as much rubbish from within the RPA as possible and stop any activity within the RPA with fencing. The MS should advise fencing positions and that no further soil is removed during construction. You could make general comments about patio construction, such as ensuring that only porous materials should be used for the finished surface within the RPA, avoiding any further soil compaction and prohibit the use of chemicals etc with the RPA. Recommend a re-inspection after completion to assess future management options.

Link to comment
Share on other sites

The method statement should be done by the company doing the patio work.

 

Or I could be mistaken:001_smile:

 

An Arb Method Statement (from BS5837) should tell the contractors undertaking the works how to do it without haming the trees. Not the same as a Method Statment before tree works. My point is that tree protection is way to late in this case...

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.