Jump to content

Log in or register to remove this advert

things can only get better


monkey boys
 Share

Recommended Posts

LOL what a day at work well get on site 7:30am start cleaning up chucking down the chimney breast (hole in the floor)

in too a wheel barrow below hailf way chucking it down i was shouted at (OI ****** what you doing)

looked down throght the hole and the polish bemo guys had nicked the barrow and all the crap is all over the floor so went down too clean that up.

(now for lunch time)

kicked over flask bit my finger.

(this after noon) found a bee/wasp nest in the cealing (leg it)

then we lost the van keys still cant get in the van.

then got cover in (black jack) bitchmin damp proofer

spent a hour cleaning it off with bleach.

NOW IM SITTING DOWN WITH A BEER LOVING IT

thinking how the hell im going to get in the van in the morn as iv got 2tone of screed too lay

Link to comment
Share on other sites

Log in or register to remove this advert

LOL what a day at work well get on site 7:30am start cleaning up chucking down the chimney breast (hole in the floor)

in too a wheel barrow below hailf way chucking it down i was shouted at (OI ****** what you doing)

looked down throght the hole and the polish bemo guys had nicked the barrow and all the crap is all over the floor so went down too clean that up.

(now for lunch time)

kicked over flask bit my finger.

(this after noon) found a bee/wasp nest in the cealing (leg it)

then we lost the van keys still cant get in the van.

then got cover in (black jack) bitchmin damp proofer

spent a hour cleaning it off with bleach.

NOW IM SITTING DOWN WITH A BEER LOVING IT

thinking how the hell im going to get in the van in the morn as iv got 2tone of screed too lay

 

lol

after kicking the flask over id of went home...:thumbup:

Link to comment
Share on other sites

lol yer i did think about it and there was no milk for tea or coffe so it was black coffe and as it stood the sparkys was pulling off site for 2days and i over herd the uther lab talking about it so i had a natter as you do.

spoke too the builder on site and got 2days work with them too cover it till the sparks got back on site.

just as i was going out the door the builder said can you plese just (black jake) the walls as we need it done befor we can screed the floor.

fair play ok ok ill doo it gets the screed down first thing.

stared too get it on as i thort im not doing it all now just need too cover where the floor is going.

finished the band looked around the place was empty so i was left too lock up.

all in a days work

Edited by monkey boys
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.