Jump to content

Log in or register to remove this advert

Recommended Posts

Posted

Can trees be repollarded with out conservation area notification if the growth is below a certain size? Such as regually pollarded limes.

 

Thanks

James image.jpg.7b21745af90c3f71f5fcbdff664077f9.jpg

Log in or register to remove this advert

Posted
You may be able to get ongoing consent to maintain the pollard without need to give notice in the further.

 

Yes, give notice that you want to repollard and repeat on whatever cycle you think best.

Posted

It's the actual tree stem measured at 1.5m above ground level that counts not the pollard regrowth stems.

 

I can't see a "rolling permission," in effect, being granted in a CA. Think you're gonna have to go through the same process every 5 years, or whatever cycle you work on.

 

Should hopefully be a straight forward process.

 

Good luck,

Paul

Posted
Also any deemed consent would only be valid for 2 years, ie it would expire before you wanted to work the tree again

 

In the interest of reducing the number of notices/apps;

 

What about section 211 notices for more than one operation?

Only one section 211 notice is needed to carry out a number of different operations on the same tree or to carry out work on a number of trees.

 

To avoid the need for repeated notices over a relatively short period of time, one notice may, where appropriate, be submitted for repeated operations, phased works or programmes of work.

Posted
In the interest of reducing the number of notices/apps;

 

What about section 211 notices for more than one operation?

Only one section 211 notice is needed to carry out a number of different operations on the same tree or to carry out work on a number of trees.

 

To avoid the need for repeated notices over a relatively short period of time, one notice may, where appropriate, be submitted for repeated operations, phased works or programmes of work.

 

Hi Adam,

 

Sorry, I'm not sure if you're asking (me) a question here or making a statement :confused1:

 

Whilst it makes perfect sense, and cuts down on bureaucracy for both the applicant / contractor and the LPA, I'm just not sure if there's the same opportunity with a Sect. 211 Notice as there is a TPO consent which can be duly conditioned which are then enforceable if anything outside of the scope of the consent occurs.

 

...or maybe I'm just over-complicating it as is often my way :blushing:

 

Cheers,

Paul

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.