Jump to content

Log in or register to remove this advert

Laying stones around a border


ATC1983
 Share

Recommended Posts

Bit of a basic question - but I've never laid stones before.

 

A lady whose ferns I pruned back today is looking stones put in around maybe a 6 metre long, two foot border at the side of her garden. I think around 1 tonne of stones will cover this adequately. She already has soil in this bit, underneath which is plastic sheeting, so I won't need to relay this. My question is should I take out the soil - maybe only 10cm deep at most - before laying the stones? She has a few shrubs she wants kept growing at intervals inside this border - so I know obviously not to lift the soil here - but should I take it out elsewhere? I know that weeds will sprout as soon as I lay the stones, if I lay them on the soil, but considering she has plant life in here is it best to leave the soil in then put stones on top of it?

 

Thanks

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 25
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

It would be normal to lay a membrane to suppress the weeds before putting stone down on a border. However if there are no perenial weeds already there and you can remove the annual weeds as soon as they appear then this is not essential. To calculate how much stone you will need a tonne of stone is about 0.6 of a cubic metre. 50mm of stone is the max this is 0.05 of a metre. Multiply this by the width and length in metres to get the cubic metre of stone required. I see no reason to remove any soil unless adding the stone would raise the level unacceptably.

Link to comment
Share on other sites

I would concrete them all in one at a time . Make sure the stones face south . I cant remember why , someone told me i think :001_smile:

i always face mine north,something to do with climate change,at least thats what someone told me :thumbup1:

Link to comment
Share on other sites

Best method to follow is the "iceberg" method. To ensure stability of the stones, for every 10cm height above ground, you need to have stones going 90cm below ground. So while you have only 1 tonne of stones above, you need to order 10 tonne in so you can put the required 9 tonne below.:thumbup:

Link to comment
Share on other sites

Best method to follow is the "iceberg" method. To ensure stability of the stones, for every 10cm height above ground, you need to have stones going 90cm below ground. So while you have only 1 tonne of stones above, you need to order 10 tonne in so you can put the required 9 tonne below.:thumbup:

 

:lol::lol: :thumbup:

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.