Jump to content

Log in or register to remove this advert

A job I'm dreading! (I love it when a plan comes together!)


Andy Collins
 Share

Recommended Posts

My client has bought the entire stock from one of this years Chelsea Flower Show gardens. Part of this are 3 x7.5metre Scots Pines, several large "dwarf" pines, and a large number of rhodies, enough to fill 2 artics. I have to create 2 planting areas, 1 incorporating some existing shrubs, but making new bed, and the second is create an "Island" in a pasture. The 7.5metre Scots weigh in a 3,5tonne each allegedly. I am nervous about this job, partly because these are the biggest trees to date I have been asked to install, and partly because I doubt that the repeated movement can do the plants any good. I had a site meeting last evening with my man with the excavator, I think we're good to go.... fingers crossed.

Link to comment
Share on other sites

Log in or register to remove this advert

  • Replies 50
  • Created
  • Last Reply

Top Posters In This Topic

The trees will be hiabbed into place, well thats the plan right now. BUT if we get the rain we dearly need, things may have to change. I'm trying to cover all the variables, probably over-complicating things in the run-up, too much time to think. Once I'm stuck in it'll probably come together. I'm really looking forward to it, albeit nervously.

Link to comment
Share on other sites

Cheers.

1st update: Originally told the plants to be shifted Wednesday, so transport booked, excavator booked, geared up for then, now got a call that the end of the show where the garden is has to be cleared 1st, so re-arrange everything transport-wise for Tuesday, organised Teleporter to off-load my end now, sorted holding area for plants. Rang and booked up back-up Teleporter (provisionally) in case something goes wrong with 1st one!:biggrin:

Link to comment
Share on other sites

2nd update:

:jumping38::jumping38::jumping38: 1st truckful arrives late, well 5pm instead of 2pm is promised, Telehandler gets fed up with waiting and clears off, I call him back when i see the lorry arrive. He rushes about and strips the bark off one pine, bleats about them being too heavy, and frets about the windows getting broken. He was not my 1st choice, that guy couldnt make it at the last minute, this was my "back-up"!! Bad day to start off, things will go up a gear tomorrow.....hopefully!

Edited by Andy Collins
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.