Jump to content

Log in or register to remove this advert

Log Splitter - sensible cycle time


arboriculturist
 Share

Recommended Posts

Log in or register to remove this advert

  • Replies 21
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

use a variable displacement load sensing hydraulic pump! and closed center valve with a flow control to control flow to valve. It could get very expensive!!

 

Wow - it just sounds expensive. Is this a PTO pump? What sort of costs and where would you source?

 

Do you find yourself adjusting the speed depending on the timber?

 

Thanks for the reply.

Link to comment
Share on other sites

No I just changed the tractor and got a JD 6420s with a 120l/min load sensing pump and a home made splitter and it works well but a bit heavy on the fuel. You will need to decide what size of cylinder you are going to use for your splitter and work out volume of rod and tube ends of cylinder and size PTO pump accordingly with the tractor a little over tick over, also do you want it vertical or horizontal and most important how fast a cycle time, 10 seconds from start to finish is quick enough if you need to pick up the next log etc. in the short term you will think it is slow but once you have been at it for a couple of hours 10 seconds will not be long enough!!

Link to comment
Share on other sites

No I just changed the tractor and got a JD 6420s with a 120l/min load sensing pump and a home made splitter and it works well but a bit heavy on the fuel. You will need to decide what size of cylinder you are going to use for your splitter and work out volume of rod and tube ends of cylinder and size PTO pump accordingly with the tractor a little over tick over, also do you want it vertical or horizontal and most important how fast a cycle time, 10 seconds from start to finish is quick enough if you need to pick up the next log etc. in the short term you will think it is slow but once you have been at it for a couple of hours 10 seconds will not be long enough!!

 

Thanks.

 

Is that basically a new version of a 2850, similar HP with all the electronics. If it is we have one on the 'To buy' list, but not this year.

 

We are running the processor and Log splitter at the same time at 480rpm PTO speed. Want to maximise running the tractor at those revs. So cycle time below 10 seconds if 2 people on splitter and they alternate.

Link to comment
Share on other sites

This is a 2 stage pump

 

It delivers high volume at low pressure until is encounters resistance p, at which point it swaps to high pressure low(er) volume

 

It makes the ram move as quicker until it touches the timber then slower but with more force

 

Hydraulic Gear Pumps Two Stage Hi-Lo Gear Pumps

 

Run it on a bog standard open centre valve

Link to comment
Share on other sites

This is a 2 stage pump

 

It delivers high volume at low pressure until is encounters resistance p, at which point it swaps to high pressure low(er) volume

 

It makes the ram move as quicker until it touches the timber then slower but with more force

 

Hydraulic Gear Pumps Two Stage Hi-Lo Gear Pumps

 

Run it on a bog standard open centre valve

 

Thanks for the info. Is a PTO version available with a through shaft and male output shaft do you know?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share


  •  

  • Featured Adverts

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.