Help please!

 

Im undertaking a flagging job in my garden, Im laying Indian limestone on a wet mortar bed.

 

I ordered the red building sand to mix with cement, should have I ordered sharp sand?

 

Will red sand be okay?

 

Ive searched the internet for this answer and asked people whom cant give me an answer so hopefully an expert can head me in the right direction! :thumbup1:

Log in or register to remove this advert

Posted

Sharp sand is also known as grit sand and is more like a fine aggregate with small pebbles and rougher sand. What kind of surface are you laying the slabs on ? If it's a concrete area you could spot it on cement but on soil or soft ground you could put hardcore down and wacker it flat then screed it with a dryish grit sand and cement mix and just drop the slabs on. I only use something like 6 sharp sand to 1 cement for this and they don't go anywhere if the hard core (20mm down to dust) is compacted well.

Posted
Sharp sand is also known as grit sand and is more like a fine aggregate with small pebbles and rougher sand. What kind of surface are you laying the slabs on ? If it's a concrete area you could spot it on cement but on soil or soft ground you could put hardcore down and wacker it flat then screed it with a dryish grit sand and cement mix and just drop the slabs on. I only use something like 6 sharp sand to 1 cement for this and they don't go anywhere if the hard core (20mm down to dust) is compacted well.

 

Its on a base of hardcore whacked down, i have a tonne of red sand, hoping i could use it.

Posted
Its on a base of hardcore whacked down, i have a tonne of red sand, hoping i could use it.

 

Barry you already have your building sand so what you need now is sharp sand at a ratio of 1 part building sand to 3 parts sharp and a good 1 part cement ( add water)with a good squeeze of fairy to make it more smooth to use.

 

Point up as you go and after you have laid 3sq mtrs the first sq mtr will have just started to go of so you can point up without making a mess.

 

Trust me I have been doing this type of work since 1979 and have try'd every combination going and the one above is the best. Just don't skimp on the cement.:thumbup:

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  •  

About

Arbtalk.co.uk is a hub for the arboriculture industry in the UK.  
If you're just starting out and you need business, equipment, tech or training support you're in the right place.  If you've done it, made it, got a van load of oily t-shirts and have decided to give something back by sharing your knowledge or wisdom,  then you're welcome too.
If you would like to contribute to making this industry more effective and safe then welcome.
Just like a living tree, it'll always be a work in progress.
Please have a look around, sign up, share and contribute the best you have.

See you inside.

The Arbtalk Team

Follow us

Articles

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.